Laserfiche WebLink
<br />CHANGE <br />ORDER <br />AlA DOCUMENT G701 <br /> <br />Distribution to: <br />OWNER <br />ARCH ITECT <br />CONTRACTOR <br />FIELD <br />OTHER <br /> <br />131 <br />5ã <br />~ <br />0 <br /> <br />Jeffrey H. Kester Architect <br />516 W Hopkins <br />San Marcos, TX 78666 <br /> <br />PROJECT: City of San Marcos <br />(name, address) Public Works Complex <br />San Marcos, TX <br />TO (Contractor): <br /> <br />CHANGE ORDER NUMBER: <br /> <br />28 <br /> <br />INITIATION DATE: <br /> <br />6 Jan 88 <br /> <br />r <br />Dryrnalla Construction Co., <br />PO Box 698 <br />Columbus, TX 78934 <br />L <br /> <br />I <br />Inc. <br /> <br />ARCHITECT'S PROJECT NO: 12691.003 <br />CONTRACT FOR: General Construction <br /> <br />--1 <br /> <br />CONTRACT DATE: <br /> <br />29 Jan 87 <br /> <br />You are directed to make the following changes in this Contract: <br /> <br />MUNICIPAL BUIIDING f SECOND FIOOR <br /> <br />ITfl.1 NO.1: <br /> <br />Finish out the second floor interior space of the <br />Municipal Buílding f for use by the City of San Marcos, <br />in accordance with the attached plans (Sheets A.-I, A-2, <br />A"..J, A-4, A-5, M-1 and E,...I) and supplerÅ“ntary Technical <br />Specification sheets, (numbered 1 through 10). These <br />plans and specifications shall be coordinated with the <br />original plans and specifications for this project. The <br />plans and specification :manual used for the City of <br />San Marcos, Texas Public, J;"brks CoITplex reroains in <br />effect for this additional v;ork and shall be considered <br />a part of this work. <br /> <br />ADD~ $214,252.00 <br /> <br />:-.Jot valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br /> <br />The original (Contract Sum) (~eeG-~ÏfmI.m~4 was. . . . . . . . . . . . . . . . . . . . . . . . . .. $ <br />Net change by previously authorized Change Orders .,.................................. $ <br />The (Contract Sum) (ÇiI.l<l.t.õ!.Q.t.e.ed..h.6.axln:t'lm COiJ:) prior to this Change Order was. . . . . . . . .. $ <br />The (Contract Sum) {Guaranteed Maximum Cost).will be (increased) {4;¡g-"aöQ~g)... <br /> <br />by this Change Order ......................................................... $ <br /> <br />The new (Contract Sum) (~rJAtaeg Md*i-RW~t) including this Change Order will be '" $ <br />The Contract Time will be (increased) {geaeaseg)-~~} by sixty <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br /> <br />1,741,747.00 <br />61,132.31 <br />1,802,879.31 <br /> <br />214,252.00 <br />2,017 ,131. 31 <br />( 60 <br /> <br />) Days. <br /> <br />Dr:yrnalla Construction Co., <br />CONTRACTOR <br />PO Box fic)R <br />Address <br />Columbus, TX 78934 <br /> <br />BV./I~Mq ¡j~d~ (?~ <br />DATE 1- J' -.Y8' . <br /> <br />4/12/88 <br />Authorized: <br />Inc. City of San r.1arcos <br />OWNER . <br />fi30 E Hqpklns <br />^dd"~r' TX 78666 <br /> <br /> <br />::~ '~,~~ <br /> <br />Jeffrey H. Kester Architect <br />ARCHITECT <br />")1 h W Hopkin!'; <br />Address <br />San Marcos, TX 78666 <br /> <br />~~ <br /> <br />DATE 1- f'- Rf <br /> <br />AlA DOCUMENT G701 . CHANGE ORDER. APRil 1978 EDITION. AIA8 . @ 1976 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.w., WASHINGTON, D.C. 20006 <br /> <br />G701 - 1978 <br />