Laserfiche WebLink
and direction of the City; or <br />R. any waste which because of its quantity, concentration, frequency of disposal, required disposal <br />procedures, regulatory status, or physical, chemical infectious or other characteristics jeopardizes <br />or may jeopardize the environmentally sound operation of a disposal site, as determined by the <br />Director. <br />1.2.33 Work - The furnishing of all labor, materials, equipment, and other incidentals necessary for the <br />successful completion of the Contract and the carrying out of all duties and obligations imposed by this <br />Contract on the Contractor. <br />1.2.34 Yard Waste - Tree limbs, grass and plant clippings, and tree or brush trimmings that are bagged <br />or bundled for curbside yard waste collection. <br />Section 1.3 Solid Waste and Single Stream Collection <br />1.3.1 Residential Unit Solid Waste Collection <br />A. The Contractor will pick up the contents of the trash cart on each service day. The contents <br />must be contained in the cart. If the Residential Unit generates additional bags or bundles, <br />there will be an additional charge for each 30- gallon bag or bundle. If the cart is overloaded <br />such that the cart overflow interferes with mechanical loading into the truck, there will be an <br />additional bag /bundle charge for each 30- gallon bag or bu -,idle that over -flows a closed Cart. <br />The extra bag /bundle charge is listed in "Attachment A ". ­w %:.ontractor will furnish to the City <br />extra bag tags for sale to customers. The Contractor will furnish each Residential Unit with one <br />new, or like new, 65 gallon Cart or, if a smaller cart is requ red by customer, a 35 gallon Cart <br />or if a larger cart is requested by customer, a 96 gallon Cart. If a Cart is in need of repair, the <br />Contractor shall make all repairs. If the cart is not repairable, Contractor will replace the cart <br />with a new cart at no additional cost. If a customer requests an additional cart due to waste <br />volume, the Contractor will deliver the Cart to the customer. The extra cart charge is listed in <br />"Attachment A ". <br />B. The Contractor will propose and implement measures to prevent spillage with the mode of <br />collection (automated/semi- automated) used by the Contractor (See section 1.4.1, Quality). <br />C. The cost for once a week trash service and once every -other week recycle service is listed in <br />"Attachment A ". <br />1.3.2 Residential and Multi - Family Single Stream Collection <br />A. The Contractor will collect the following Recyclable Materials from each Residential Unit in <br />the contract area one time every- other -week basis and from each Multi- Family Unit one time <br />per week. <br />Metal Containers <br />Aluminum cans <br />Ferrous cans <br />Clear glass <br />Colored glass <br />5 <br />