My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1988-104
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1988
>
Res 1988-104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2007 11:06:28 AM
Creation date
8/10/2007 11:06:28 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Grant Award
Number
1988-104
Date
9/26/1988
Volume Book
92
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1. <br /> <br />(Revised 3/84) <br /> <br />ATTACHMENT 2 <br /> <br />STATE DEPARTMENT OF HIGHWAY'S AND PUBLIC TRANSPORTATION <br /> <br />GENERAL PROVISIONS FOR TEXAS TRAFFIC <br /> <br />SAFETY' PROGRAM CONTRACTS <br /> <br />DEFINITIONS: <br /> <br />A. <br /> <br />Commission: <br />Texas. <br /> <br />The State Highway and Public Transportation Commission of <br /> <br />B. <br /> <br />Contract Manager: The representative of the Department immediately <br />responsible for liaison between the Department and the Contractor, and <br />for supervision and inspection of the work or activity conducted under <br />this contract and of the materials used. <br /> <br />C. <br /> <br />Contractor: The State agency, political subdivision, corporation, firm <br />or individual entering into agreement within the State or the <br />Department under this contract, or any subcontractor of such an entity. <br /> <br />D. <br /> <br />Department: The State Department of Highways and Public <br />Transportation. <br /> <br />E. <br /> <br />Effective Date: Unless otherwise specified, the <br />contract or contract modification is the date of <br />party whose consent is necessary to the validity <br />modification. <br /> <br />effective date of a <br />signature of the last <br />of the contract or <br /> <br />F. <br /> <br />Engineer: The State Engineer-Director of the Department, or his <br />authorized representative. <br /> <br />G. <br /> <br />Project Director: The representative of the Contractor immediately <br />responsible for liaison between the Department and the Contractor. <br /> <br />H. <br /> <br />State of Texas. <br /> <br />State: <br /> <br />1. <br /> <br />Subcontract: Any agreement between the Contractor and a third party, <br />assigning to that third party any of the obligations for personal and <br />professional services undertaken by the Contractor under this contract. <br />The term excludes contracts for the purchase of goods only, or for <br />general employment, whether full-time, part-time or intermittent. The <br />third party subcontractor may be an individual or an organization, <br />including a corporation, a partnership, a proprietorship, a joint ven- <br />ture or a co-venture. <br /> <br />J. <br /> <br />U.S. DOT: The United States Department of Transportation, acting <br />through either the Federal Highway Administration or the National <br />Highway Traffic Safety Aàministration, as may be appropriate. <br /> <br />1 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.