Laserfiche WebLink
<br />. I:HKA., MAR <br /> <br />EXHIBIT liB II <br />FEE SCHEDULE B <br /> <br />200 <br /> <br />CREW & EQUIPMENT TRANSPORTATION FEES <br /> <br />SITE lNVESTIGATION SERVICES <br /> <br />201 <br />202 <br /> <br />203 <br /> <br />Truck-mounted drilling rig & crew mobilization <br />To and from Project Site, per mile.....................$ 2.00 <br /> <br />Minimum Charge".""."".............................$ 75.00 <br /> <br />Trucking & permit fees for marsh buggy-mounted <br /> <br />drilling rig.............................'...........Cost <br /> <br />Drill Crew Travel to and from job site (other than <br />drilling rig) <br /> <br />204 Per mile"".'.""'..............................$ 0.50 <br /> <br />205 Per man-hour"""'."'.,.""..................,..$ 20.00 <br /> <br />210 <br /> <br />DRILLING & SAMPLING CHARGES <br /> <br />samPle""...""..'."'..........................$ 15.00 <br /> <br />Drilling & sampling as in 210 with marsh buggy drilling rig. <br /> <br />218 Buggy equipped with rice & cane tires, per foot...$ 15.00 <br />219 Buggy equipped with Terra Tires, per foot <br />(plus mounting and demounting costs)..............$ 16.00 <br />Casing of boring through overburden for soils sampling, <br /> <br />per foot""""""""...............................$ 5.00 <br /> <br />Drilling rig with equipment and crew, each rig, <br /> <br />per hour""".........................................$100.00 <br /> <br />Relocation time in excess of 30 minutes per boring or <br />standby, per hour""""""..'.......................$100.00 <br /> <br />OTHER CHARGES <br /> <br />217 <br /> <br />219 <br /> <br />220 <br /> <br />221 <br /> <br />~rilling & sampling with Shelby Tube (thin wall) sampler <br />in clay and 2-inch split spoon sampler in sand; truck-mounted <br />drilling rig. <br />211 Drilling without sampling a ft. to 50 ft., <br /> <br />per foot"""".'................................$ 6.'00 <br /> <br />212 Continuous, 0 ft. to 20 ft., per foot.............$ 15.00 <br />213 Intermittent sampling 1 ft. to 50 ft., per foot <br />(add unit prices for each Texas Highway Department <br />(THO) Cone Penetrometer, Standard Penetration Test <br />or 3: Shelby tube sample..........................$ <br />Rock coring, soft rock, per foot.................. $ <br />Rock coring, hard rock, per foot..................$ <br />Texas Highway Department Cone Penetrometer Test, <br />Standard Penetration Test or 3" Shelby Tube <br /> <br />214 <br />215 <br />216 <br /> <br />8.50 <br />15.00 <br />18.00 <br /> <br />225 <br /> <br />228 <br /> <br />229 <br /> <br />231 <br /> <br />Supplemental Personnel <br />226 Field Engineer, per hour"."..'.'.........r......$ <br />227 Crew Man, per hour................................ $ <br />I~-$itu measuring devices and materials, including <br />p~e~ometers, pore pressure transducers, inclinometers <br />specialized equipment, and required associated materi~ls <br />such as sand and cement, and transportation.'.......Cost <br />Other reimbursable expense items...'...'....'.......Cost <br /> <br />45.00 <br />20.00 <br /> <br />Monitoring of water levels, per hour""'.'............$ 3.2.50 <br />Page 1 of 3 <br />