Laserfiche WebLink
<br />A <br />ACTIVITY <br />""'ER <br /> <br />1 <br /> <br />N <br />N <br /> <br />30 <br /> <br />u <br /> <br />B <br />ACTIVITY <br />fUME <br /> <br />Water and Sewer <br />Facil ities <br /> <br />TAELE 1 - DESCRIP1'ION OF' PROJECT ACTIVITIES <br /> <br />C <br />DEseR I P1' ION OF <br />ACTIVITIES <br /> <br />Construction of a 9,200 gallon per minute (firm) lift station <br />to replace two above grade crossings of the San Marcos River. <br />The lift station includes two 12 foot diameter precast wet <br />wells with a total storage capacity of 27,100 gallons, and two <br />41x41x61 valve vaults. Each wet well will contain two non~clog <br />submersible pumps rated at 3200 gpm at 1551 TDH. <br /> <br />Construction of approximately 1174 LF of 20" force main from <br />the proposed lift station to an existing 2O" force main along <br />River Road. <br /> <br />Work will be done by bid/contract process. <br /> <br />ENGINEERING/ARCHI_ Engineering services for all project related activities, including <br />TECTURAL SERVICES preliminary and final design., plans and specifications, special <br />BASIC SERVICES- services, and all interim and final inspections. <br />SPECIAL SERVICES- <br /> <br />GEHE RAL Al»81 N I S - <br />TRATION <br /> <br />General Administration activities, including the cost associated <br />with the required program and fiscal and compliance audit. <br /> <br />0 <br />AIIDUfT OF' <br />FUGJS <br /> <br />349,100 <br /> <br />38,000 <br /> <br />22,000 <br /> <br />ADM I N I STRATI VE FUNDS ARE L I" I TED TO I 6.,. OF n£ TOTAL TCDP CCWSTRUCT I ON DOLLARS REQUESTED <br /> <br />E <br />souna: <br />OF' Fl.NDS <br /> <br />TCDP/City <br /> <br />City <br /> <br />City <br />