My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 1988-080
San-Marcos
>
City Clerk
>
02 Ordinances
>
1980 s
>
1988
>
Ord 1988-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2007 11:35:07 AM
Creation date
8/10/2007 11:35:07 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amending
Number
1988-80
Date
10/24/1988
Volume Book
93
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />v. <br /> <br />SYSTEM ANALYSIS AND DEVELOPMENT <br /> <br />A. <br /> <br />Pressure Plane Boundaries <br /> <br />The study area may be served by the existing upper and lower <br />pressure plane water elevations along with a new pressure plane <br />for the far western portion of the basin where the ground <br />elevation is greater than 800 feet MSL (Figure 9). The new <br />pressure plane will be called the upper upper pressure plane. <br />The overflow elevation of elevated water storage for the upper <br />upper pressure plane is 1050 feet MSL, the upper plane is 905 feet <br />~ISL, and the lower plane is 767 feet MSL. The upper upper <br />pressure plane will easily serve an area elevation of 930 feet MSL <br />to 800 feet MSL. The upper pressure plane will easily serve an <br />area elevation of 800 feet MSL to 650 feet )tSL. The lower <br />pressure plane .,vill easily serve an area elevation of 650 feet MSL <br />to 500 feet MSL. The area above the 800 foot contour in the <br />study area comprises the upper upper pressure plane. The study <br />area west of Hunter Road and east of the 800 foot contour <br />generally falls within the range for the upper plane. The <br />remainder of the area is v.ithin the range for the lower plane <br />(Figure 8). One exception is that the proposed system includes a <br />line from the upper pressure plane along Center Point Road from <br />east of Hunter Road to IH-35. This line will provide higher <br />pressure water to the planned industrial and commercial facilities <br />along IH-35 than a line would from the lower plane, however, the <br />delivery pressures are still within the recommended linùts. <br /> <br />B. <br /> <br />Phasing of the System <br /> <br />The proposed system is designed to be constructed in 3 separate <br />phases (Figure 8). The first phase will involve only the <br />Lowrnans' Ranch and Cottonwood Creek Park developments because <br />only this area of the basin is expected to experience sufficient <br /> <br />JONES ðE NEUSE <br /> <br />2~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.