Laserfiche WebLink
<br />EYHIBITft <br /> <br />PtP.Frp~1ANCE STft,TEr~nn <br /> <br />CITY OF SAN MARCOS <br /> <br />Contractor shall carry out the following activities as described in its 198?, <br />Emergency Shelter Grart ?rogra~ application: <br /> <br />Secti on. 1 <br /> <br />Renovating, ~ajor Rehabilitation, or Conversion <br /> <br />Southsi de Communi ty Center - Contractor shall provi de a grant of Seventy-Seven <br />Thousand Three Hundred Ninety and no/100 dollars ($77,390.00) for the <br />renovation and conversion of the Southside Community Center. Penovation and <br />conversion activities shall consist of the following: <br /> <br />- Remove first floor restrooms. <br />- Remove first floor heater. <br />- Remove first fioor heater closet. <br />- Remove walls and doors- first floor northwest corner. <br />- Rel'1ove CE'i 1 i ng i n fi rs t fl cor ha 1 h!aY. <br />- Remove heater vents in first floor hallway. <br />- Remove rotted wood fioor in R/R and northwest corner of <br />- Remove rotted \foJood- north anl1 south edge of 9Yl11 floor. <br />- Remove kitchen cabinets. <br />- Remove kitchen sink. <br />- Remove west wall and door in kitchen. <br />- Remove attic heòter vents. <br />- Remove gym windows. <br />- Remove gym doors. <br />- Remove existinq roof cnverinq. <br />- remove rotted ~~rch and roof: <br />- Renovate restrooms. <br />- New central HVAC first floor (3 to~). <br />- t!e\:! central HVA.C gym (2 units- 3 tons each). <br />- New central HVAC 2nd floor (3 ton). <br />- Wiring to code. <br />- NeH pll1mhing to code. <br />- Install grease trap. <br />- New commercial kitchen. <br />- Replace water heater. <br />- replace floor in kitchen area. <br />- Replace floor in restrooms. <br />- Replace floor in gy~. <br />- Replace windows in Rvrn. <br />- P~place exit doors in ~YI'1. <br />- Replace ceiling in first floor. <br />- Replace Spanish tile roof. <br />- Replace 2 porches, inclurling roof material. <br />- Paint. <br /> <br />first floor. <br /> <br />Page 1 of 2 <br />