Laserfiche WebLink
<br />61 <br /> <br />RESOLUTION 1988-128R <br /> <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY <br />OF SAN ~1ARCOS APPROVING 'THE TERMS AND <br />CONDITIONS OF A CONTRACT FOR ENGINEERING AND <br />SURVEYING SERVICES WITH PRO-TECH ENGINEERING <br />GROUP, INC. IN CONNEC'rION ~'JITH THE 1988 <br />VICTORY GARDENS PAVING AND DRAINAGE <br />IMPROVEMENTS PROJECT, AUTHORIZING THE MAYOR TO <br />EXECUTE SAID AGREEMENT ON BEHALF OF SAID CITY <br />AND DECLARING AN EFFECTIVE DATE. <br /> <br />WHEREAS, the City of San Marcos desires to construct pavinq <br />and drainage improvements in the Victory Gardens area; and, <br /> <br />WHEREAS, engineering and surveying <br />with the design and construction of <br />necessary; and, <br /> <br />services in connection <br />said improvements are <br /> <br />WHEREAS, Pro-Tech Engineering Group, <br />perform said services; now, therefore, <br /> <br />Inc. <br /> <br />is <br /> <br />qualified <br /> <br />to <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SAN I"1ARCOS, <br />TEXAS: <br /> <br />PART 1. That the terms and cond i t ions of a contract vIi th <br />Pro-Tech Engineering Group, Inc. for engineering and surveying <br />serv ices in connection with the 1988 Victory Gardens Pav imj and <br />Drainage Improvements Project, a copy of said contract being <br />attached hereto and incorporated herein for all purposes, are <br />approved. <br /> <br />PART 2. That the Mayor, Kathy M. r'1orris, be and she is <br />hereby authorized to execute said contract on behalf of said City. <br /> <br />PART 3. That this Resolution shall be <br />effect immediately from and after its passage. <br /> <br />in <br /> <br />full <br /> <br />force <br /> <br />and <br /> <br />ADOPTED this the 14 <br /> <br />day of <br /> <br />November <br /> <br />, 1988. <br /> <br />~Ø!;:~ <br /> <br />Mayor <br /> <br />Attest: ) <br /> <br />.jþ:ri / <br />~Us~omac~ W~~ <br /> <br />City Secretary <br />