Laserfiche WebLink
<br />issue a final Certificate for Payment or take other appropriate action; <br /> <br />and shall make a written recommendation to Owner regarding Owner's <br /> <br />acceptance of the Project. <br /> <br />1. 5.13 <br /> <br />The extent of the duties, responsibilities and limitations of <br /> <br />authority <br /> <br />of <br /> <br />the <br /> <br />Engineer <br /> <br />as <br /> <br />the <br /> <br />Owner's <br /> <br />representative <br /> <br />during <br /> <br />construction shall not be modified or extended after the construction <br /> <br />contract documents have been authorized by Owner <br /> <br />to <br /> <br />be <br /> <br />competitively <br /> <br />bid without written consent of the Owner and the Engineer and with <br /> <br />notice to the Contractor. <br /> <br />1.5.14 <br /> <br />The Engineer shall prepare and submit to the Owner a set of <br /> <br />reproducible record drawings showing significant changes in the Work <br /> <br />made during the construction phase. <br /> <br />1. 5 . 15 <br /> <br />In the event of any arbitration proceeding as provided in the <br /> <br />construction contract <br /> <br />documents, <br /> <br />the Engineer may be made <br /> <br />a party <br /> <br />thereto at the request of either Owner or Contractor. <br /> <br />1.6. <br /> <br />SURVEYIBG PHASE <br /> <br />Engineer shall perform surveys to procure and provide owner with a <br /> <br />field note description of the proposed easements and perform surveys to <br /> <br />establish horizontal and vertical controls for the construction of the <br /> <br />project, <br /> <br />i.e., <br /> <br />construction staking, <br /> <br />and surveys <br /> <br />for design of the <br /> <br />project. <br /> <br />1.7 <br /> <br />ADDI~IORAL SERVICES <br /> <br />For <br /> <br />the <br /> <br />purposes <br /> <br />of <br /> <br />this <br /> <br />Contract, <br /> <br />additional <br /> <br />services <br /> <br />will <br /> <br />be <br /> <br />considered to be all services not included in the basic contracted <br /> <br />services as identified in Article 1, excluding Sections 1.7 and 1.8 and <br /> <br />those, if any, identified in Article 14 of this Contract. <br /> <br />Additional <br /> <br />services shall be provided if authorized or confirmed in writing by the <br /> <br />Owner as <br /> <br />provided in this Agreement, <br /> <br />and compensation shall be <br /> <br />in <br /> <br />addition <br /> <br />to <br /> <br />that <br /> <br />specified <br /> <br />for <br /> <br />basic <br /> <br />services. <br /> <br />Compensation <br /> <br />for <br /> <br />additional services shall be in accordance with Section 13.2.1 of this <br /> <br />Agreement. <br /> <br />No additional services shall be performed by the Engineer <br /> <br />without the prior written authorization of Owner's City Manager or, if <br /> <br />the total amount of additional services exceeds $5,000.00, the City of <br /> <br />San Marcos City Council. <br /> <br />Additional services shall include but not be <br /> <br />limited to the following potential work items. <br /> <br />-8- <br />