Laserfiche WebLink
<br /> <br />TABLE 8 <br /> <br />WATER MAIN COST ALLOCATION <br />INCLUDING ENGINEERING AND CONTINGENCY (30%) <br /> <br /> LOMAN COTTON SAN <br /> TOTAL RANCH CR PARK MARCOS <br /> -L- --L- ----L- ---1..- <br />PHASE I 353,080 212,247 99,258 41,574 <br />PHASE II 4,241,055 892,728 128,422 3,219,906 <br />PHASE III 3,801,980 0 0 3,801,980 <br /> 8,396,115 1,104,975 227,680 7,063,460 <br /> <br />JONES a: NEUSE <br />