Laserfiche WebLink
<br />TABLE 10 <br />TOTAL COST SUMMARY <br />INCLUDING ENGINEERING AND CONTINGENCY (30%) <br /> <br /> LOMAN COTTON SAN <br /> RANCH CR PARK MARCOS TOTAL <br /> -L- ---L- ---L- $ <br />PHASE I 337,457 125,879 412,994 876,330 <br />PHASE II 1,217,045 162,742 3,584,523 4,964,310 <br />PHASE III 670,800 81,250 4,808,180 5,560,230 <br /> 2,225,302 369,871 8,805,697 11,400,870 <br /> <br />JONES ð: NEUSE: <br />