Laserfiche WebLink
<br />SAN MARCOS ELECTRIC UTILITY <br />ELECTRIC RATE SCHEDULES <br /> <br />I <br />II, <br />Effective February 1, 2005 <br /> <br />LARGE GENERAL SERVICE-SECONDARY <br />Rate Schedule - LGS-Sec <br /> <br />PAYMENT <br /> <br />The due dates, penalty dates, and disconnection dates for bills shall be linked to the Customers' billing cycles in <br />accordance with the following table of dates for each cycle <br /> <br />Cycle # Billing Date Due Date and Penalty Date Disconnection Date <br />1 16m 3ra of the following month 14m of the following month <br />2 24m 11 m of the following month 2151 of the following month <br />3 15 18m of the same month 28Ln of the same month <br />4 am 25m of the same month 4Ln of the following month <br /> <br />Any and all amounts not paid before the penalty date shall be assessed a charge in the amount of 10% of the unpaid <br />amount. <br /> <br />Payments from state agencies must be received within 30 days from receipt of bill, and any unpaid amount will be subject <br />to a 1 0% per month interest charge following the procedures set forth in the Prompt Payment Act. <br /> <br />CONTRACT DEMAND <br /> <br />~rvice under this rate schedule requires the Customer execute a standard contract for a minimum term of 12 months for <br />specified Contract Demand to be used in the determination of the BilLING DEMAND, as described hereinafter <br /> <br />DETERMINATION OF BILLING DEMAND <br /> <br />The BilLING DEMAND each month for shall be the greater of" <br /> <br />a the highest metered kW demand established during any 30 minute interval during the month, <br /> <br />b 65 0% of the highest kW demand established during any 30 minute interval during the immediately <br />preceding 11 months, or <br /> <br />c. 350 kW; or <br /> <br />d 50 0% of the Contract Demand <br /> <br />POWER FACTOR ADJUSTMENT <br /> <br />The monthly metered kW demand may be adjusted to an equivalent 90 0% power factor for the purpose of establishing <br />the monthly BilLING DEMAND when the power factor at the point of delivery to the Customer is determined to be less <br />than 90 0% Such adjustment will be deferred for 6 months at a new point of delivery to allow for corrective action by the <br />Customer <br /> <br />Page 10 <br />