My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2005-008
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2005
>
Ord 2005-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2007 5:03:44 PM
Creation date
8/27/2007 9:01:44 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Revising
Number
2005-8
Date
1/18/2005
Volume Book
160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SAN MARCOS ELECTRIC UTILITY <br />ELECTRIC RATE SCHEDULES <br />STREET LIGHTING & TRAFFIC SIGNAL SERVICE <br />Rate Schedule - SL <br /> <br />Ii <br />L:ifective February 1,2005 <br /> <br />MINIMUM CHARGE <br /> <br />The monthly minimum charge shall be the sum of the CUSTOMER CHARGE and all applicable rate adjustments. <br /> <br />PAYMENT <br /> <br />The due dates, penalty dates, and disconnection dates for bills shall be linked to the Customers' billing cycles In <br />accordance with the following table of dates for each cycle <br /> <br />Cycle # Billing Date Due Date and Penalty Date Disconnection Date <br />1 16lr 3ra of the following month 141r of the following month <br />2 24111 11m of the following month 2151 of the following month <br />3 151 18m of the same month 28m of the same month <br />4 8m 25m of the same month 4 of the following month <br /> <br />Any and all amounts not paid before the penalty date shall be assessed a charge in the amount of 10% of the unpaid <br />amount. <br /> <br />yments from state agencies must be received within 30 days from receipt of bill and any unpaid amount will be subject <br />a 1 0% per month interest charge following the procedures set forth in the Prompt Payment Act <br /> <br />SPECIAL CONDITIONS <br /> <br />The City will furnish and operate all street lighting facilities required for service under this Schedule SL. Service to <br />locations where City System poles and facilities are not available will be made at the discretion of the City and at an <br />additional charge to the Customer to cover the costs, including appropriate overheads, of additional poles, conductors, <br />other facilities and increased maintenance expenses. The cost of maintaining and repairing any equipment necessary for <br />street lighting service under this Schedule SL shall be billed to the Customer at cost, including appropriate overheads. <br />The City shall, at the request of the Customer, relocate or change existing equipment and the Customer shall reimburse <br />the City for any and all such relocations or changes at actual cost including appropriate overheads. <br /> <br />INTERRUPTION OF SERVICE <br /> <br />The City will make reasonable provisions to ensure satisfactory and continuous service, but does not guarantee a <br />continuous supply of electric power and energy from the City System facilities and shall not be liable for damage <br />occasioned by interruptions of service or failure to commence delivery caused by acts of God or the public enemy, or for <br />any cause reasonably beyond the control of the City, including, but not limited to, the failure or breakdown of facilities, <br />floods, fire, strikes, or actions or orders of any agency having jurisdiction in the premises, or for interruptions which are <br />necessary for inspection, repair, or changes in the equipment and facilities of the City, the City System or the bulk power <br />supplier(s) to the City System The Customer shall notify the City immediately of any defect, trouble or accident which <br />may in any way affect the delivery of electric service by the City from the City System <br /> <br />Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.