My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-014
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2007 11:10:14 AM
Creation date
8/27/2007 11:10:13 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1986-14
Date
2/10/1986
Volume Book
77
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> A. For identifying for the Owner all subsurface <br /> investigations, including borings, test pits, soil investigations, <br /> soil resistivity surveys; and other subsurface exploration <br /> necessary for accurate design of the project(s), the Engineer <br /> shall receive no compensation. <br /> B. For the review of ingress and egress associated with the <br /> soils investigations; review of any proposals associated with the <br /> soils investigation; monitoring and reviewing the work of testing <br /> laboratories and inspection bureaus associated with the soils <br /> investigation; any other work associated with the soils <br /> investigation not defined hereinabove; any other work as requested <br /> by the Owner, the Engineer shall be compensated for the work on <br /> the standard cost times multiplier basis as shown in Exhibit A, <br /> Schedule of Charges. <br /> The Engineer may submit monthly requests or billings for <br /> partial payment based on the amount of work completed. Said <br /> requests or billings shall be itemized on the basis of hours <br /> expended by position and shall include all other pertinent <br /> information. Payment shall become due and payable within thirty <br /> (30) days from receipt. <br /> 5.7 ADDITIONAL SERVICES <br /> 5.7.1 For Additional Services rendered as described in Section <br /> 1.5, the Engineer shall be compensated for the work on the <br /> standard cost times multiplier basis as shown in Exhibit A, <br /> Schedule of Charges. <br /> The Engineer may submit monthly requests or billings for <br /> partial payment based on the amount of work completed. Said <br /> requests or billings shall be itemized on the basis of hours <br /> expended by position and shall include all other pertinent <br /> information. Payment shall become due and payable within thirty <br /> (30) days from receipt. <br /> 5.8 PROJECT ( S) SUSPENSION OR TERMINATION <br /> 5.8.1 If the project(s) is suspended or abandoned in whole or <br /> in part for more than three (3) months, the Engineer shall be <br /> compensated for all services performed prior to receipt of written <br /> notice from the Owner of such suspension or abandonment. If the <br /> -21- <br />
The URL can be used to link to this page
Your browser does not support the video tag.