Laserfiche WebLink
<br /> TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT <br /> ARTICLE 1 ments to previous Statements of Probable Construction <br />ARCHITECT'S SERVICES AND RESPONSIBILITIES Cos.t indicated by changes in requirements or general <br /> market conditions. <br />BASIC SERVICES 1.3.4 The Architect shall assist the Owner in connection <br /> The Architect's Basic Services consist of the five with the Owner's responsibility for filing documents reo <br /> phases described in Paragr~phs 1.1 through 1.5 and quired Tor the approval of governmental authorities hav. <br /> include normal structural, mechanical and electrical ing jurisdiction over the Project. <br /> engineering services and any other services included 1.4 BIDDING OR NEGOTIATION PHASE <br />* in Article 15 as part of Basic Services. *-1.4.1 The Architect, foHowing the Owner's approval of <br />1.1 SCHEMATIC DESIGN PHASE the Construction Documents and of the latest St;',tement <br />1.1.1 The Architect shall review the program furnished of Probable Construction Cost, shall <br />by the Owner to ascertain the requirements of the Project obtain bids or negotiated proposals, and assist in <br />and shall review the understanding of such requirements awarding -and preparing contracts for construction. <br />with the Owner. 1.5 CONSTRUCTION PHASE-ADMINISTRATION <br />1.1.2 The Architect shall provide a preliminary evalua. OF THE CONSTRUCTION CONTRACT <br />tion of the program and the Project budget requirements, 1.5.1 The Construction Phase will commence with the <br />each in terms of the other, subject to the limitations set award of the Contract for Construction and, together with <br />forth in Subparagraph 3.2.1. the Architect's obligation to provide Basic Services under <br />1.1.3 The Architect shall review with the Owner altema- this Agreement, will terminate when final payment to the <br />tive approaches to design and construction of the Project. Contractor is due, or in the absence of a final Certificate <br />1.1.4 Based on the mutually agreed upon program and for Payment or of such due date, sixty days after the Date <br />Project budget requirements, the Architect shall prepare, of Substantial Completion of the Work, whichever occurs <br />for approval by the Owner, Schematic Design Documents first. <br />consisting of drawings and other documents illustrating 1.5.2 Unless otherwise provided in this Agreement and <br />the scale and relationship of Project components. incorporated in the Contract Documents, the Architect <br />1.1.5 The Architect shall submit to the Owner a State. shall provide administration of the Contract for Construc- <br />ment of Probable Construction Cost based on current tion as set forth below*and in the edition of AlA Docu- <br />area, volume or other unit costs. ment A201, General Conditions of the Contract for Con- <br /> struction, current as of the date of this Agreement. <br />1.2 DESIGN DEVELOPMENT PHASE I 1.5.3 The Architect shall be a representative* of the <br />1.2.1 Based on the approved Schematic Design Docu- Owner during the Construction Phase, and shall advise <br />ments and any adjustments authorized - by the Owner in and consuh with the Owner. Instructions to the Contrac- <br />the program or Project budget, the Architect shall pre. tor shall be forwarded through the Architect.*The Archi- <br />pare, for approval by the Owner, Design Development tect shall have authority to act on behalf of the Owner <br />Documents consisting of drawings and other documents only to the extent provided in the Contract Documents <br />to fix and describe the size and character of the entire unless otherwise modified by written instrument in ac- <br />Project as to architectural, structural, mechanical and elec- cordance with Subparagraph 1.5.16. <br />trital systems, materials and such other elements as may 1.5.4 The Architect shall visit the site at intervals ap- <br />be appropriate. propriate to the stage ot' construction or as otherwise <br />1.2.2 The Architect shall submit to the Owner a further agreed by the Architect in writing to become generally* <br />Statement of Probable Construction Cost. familiar with the progress and quality of the Work and to <br />1.3 CONSTRUCTION DOCUMENTS PHASE determine*in general if the Work is proceeding in accord. <br /> ance with die Contract Documents; However, the Arch!. <br />1.3.1 Based on the approved Design Development Doc- tect shall not be required to make exhaustive* <br />uments and any further adjustments in the scope or qual- on-site inspections to check the quality or*quan. <br />ity of the Project or in the Project budget authorized by tHy of the Work. On the- basis of such on-site observa- <br />the ~wner, the Archit~ct shàll prepart all. contr?ct tjons as an architect, the Architect shall keep the Owner <br />.and or canstructlan acumen S t mc) ud mg: informed of the progress and quality of the Work, and <br />* ~ l~J~! þ~U ~I ~ ~tŠsH~~;s ~~~} !~~: ~! ~,i! ~~~!~ J- g - shall- endeavor*to guard the Owner against defects and <br /> deficiencies in the Work of the Contractor. * <br /> 1.5.5 The Architect shall not have control or charge of <br />tion of the necessary bidding information, bidding forms, and shall not be responsible for construction means, <br />the Conditions of the Contract, and the form of .Agree- methods, techniques, sequences or procedures, or for <br />ment between the Owner and the Contractor. safety precautions and programs in connection with -the <br />1.3.3 The Architect shall advise the Owner of any adjust- Work, for the acts or omissions of the Contractor, Sub- <br />AlA OOCUMENT 8141 . OWNER-ARCHITECT AGREEMENT. THIRTEENTH EOITION . JULY 1977. AIA4t . (¡ 1977 8141-1977 3 <br />THE AMERICAN INST1TUTE Of ARCHITECTS, 17JS NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 <br />* See Article 15, Other Conditions Or Servic~s <br />