Laserfiche WebLink
<br />EXHIBIT E <br />ENGINEER'S COST ESTIMATES <br /> <br /> <br /> <br />The following cost estimates identify the costs for: <br /> <br />1. The sanitary sewer interceptor contemplated by this Community <br />Facilities Agreement, and <br /> <br />2. The original sanitary sewer to have been built to serve only S B & <br />K, Dobie, Salinas & Rochford; Rakor, Inc and Guy Shown Company. <br /> <br />Sanitary Sewer Interceptor (CFA) <br /> <br />CONSTRUCTION $386,988 <br />24" PVC (8-10' depth), 1938 LF @ $35.50/LF $ 68,799 <br />24" PVC (10-12' depth), 985 LF @ $37.75/LF 37,184 <br />24" PVC (12-14' depth), 433 LF @ $42.50/LF 18,403 <br />24" PVC (14-16' depth), 860 LF @ $49.00/LF 42,140 <br />24" PVC (16-18' depth), 108 LF @ $58.00/LF 6,264 <br />15" forcemain, 2900 LF @ $20.00/LF 58,000 <br />Manholes, 11 ea @ $1200/ea 13,200 <br />Extra depth for manholes, 56 VF @ $lOO/VF 5,600 <br />Lift station, 1 ea @ $60,000/ea 60,000 <br />Subtotal $309,590 <br />Contingency @ 25% 77,398 <br />$386,988 <br /> <br />ENGINEERING 55,000 <br />,,>, Easement survey $ 8,000 <br />~""'/', " Topographic survey 10,000 <br />.-~Y- ,"": ,.,.,"" Engineering design 20,000 <br />-- "'-'/~ <br />~ ",' Construction surveying 3,000 <br />Construction administration 6,000 <br />~ $47,000 <br />\,;,,:-.'1--' Contingency 8,000 <br />,.,e;-< .,.; $55 000 <br />" i '-' , <br /> <br />LEGAL FEES 10,000 <br />PROJECT MANAGEMENT FEE 22,599 <br />TOTAL ESTIMATED COST $474,587 <br />