My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-080
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2007 2:26:28 PM
Creation date
8/27/2007 2:26:28 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1986-80
Date
7/14/1986
Volume Book
80
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> TABLE 4 <br /> PARTIAL LISTING OF CURRENT PROJECTS <br /> BYRN AND ASSOCIATES, INC. <br /> Client Project Description Status <br /> <br /> River Ridge River Ridge PUD Design of water and wastewater Design In <br /> Joint Venture Subdi vision system, site drainage, Progress <br /> detention, streets and <br /> flood studies, platting and <br /> surveYing <br /> WiSer Hills of Hays Phase I and Phase II Design Phase I Complete <br /> Subdivision of water and wastewater system, Phase II <br /> site drainage, detention and In Progress <br /> streets, platting and surveying <br /> Bluebonnet San Marcos Phase I and Phase II Phase I and <br /> Development Business Park Design of water and wastewater Complete <br /> system, site drainage, detention and <br /> streets, platting and surveying. <br /> Doug Drive South Cross Phase I Design of water and Phase I Design <br /> Business Park wastewater system, site drainge, In Progress <br /> detention, streets, and flood studies, <br /> platting and surveying. <br /> Minter Minter Phase I design of water q.nd Phase I Design <br /> Brothers Addition wastewater system, site drainage, Complete <br /> and flood studies, platting <br /> and surveying <br /> Dwyer-Sanders River Chase Preliminary plat submittals Phase I Design <br /> pun for water and wastewater On Hold <br /> Subdivision systems, site drainage, detention <br /> system, flood studies and <br /> streets <br /> RA KOR Interpark Section I - IV design Design In Progress <br /> East of water and wastewater <br /> system, site drainage, streets, <br /> and de~ention, platting and <br /> surveYing <br /> TETCO Hunters Section I design Design Complete <br /> HilI of water and wastewater <br /> Subdivision system, site drainage, streets, <br /> detention and flood studies, <br /> platting and surveying. <br /> Hurwitz Plum Design of water and Design Complete <br /> Creek PUD wastewater system, site <br /> Subdivision drainage, and streets, platting <br /> and surveying <br /> JONES 8< NEUSE <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.