Laserfiche WebLink
<br /> 2.3 Population and Land Use Projections <br /> 2.3.1 Population Projections for 5-, 10-, 20-year and Ultimate Conditions <br /> 2.3.2 Land Use Allocations <br /> 2.3.2.1 Allocation by Land Use Type <br /> 2.3.2.2 Allocation by Subbasin Area <br /> 2.3.3 Buildout Schedule <br /> 2.3.3.1 5-Year <br /> 2.3.3.2 10-Year <br /> 2.3.3.3 20-Year <br /> 2.3.3.4 Ultimate <br /> 2.4 Water and Wastewater Demand Projections <br /> 2.4.1 Design Criteria <br /> 2.4.2 Subbasins <br /> 2.4.3 Schedule <br /> 3.0 WASTEWATER - COLLECTION, TREATMENT AND DISPOSAL <br /> (estimated cost: $23,000) <br /> 3.1 Limits of Study <br /> 3.2 Wastewater <br /> 3.2.1 Treatment Alternatives <br /> 3.2.1.1 Levels of Treatment <br /> 3.2.1.2 Activated Sludge <br /> 3.2.1.3 Innovative Technology <br /> 3.2.2 Disposal Alternatives <br /> 3.2.2.1 Discharge or Disposal <br /> 3.2.2.2 Land Application; Irrigation <br /> 3.2.2.3 Intermittent Stream Discharge <br /> 3.2.2.4 Innovative Technology <br /> JONES Be NEUSE <br /> <br /> 24 <br />