Laserfiche WebLink
<br />Continuatioo of Table 9.3 <br /> <br />SlIm' '.l'BBM MRmL ~ R!QJIRIIBfJS: <br /> <br />Assume: Average ammal costs over Short Term through 1990 <br /> <br />RmMly: <br />Taxiway and Stubs: <br />ApJ:a1: <br />Auto Parking and Roads: <br /> <br />$ 380,000 S.Y. <br />35,000 S.Y. <br />190,000 S.Y. <br />18,000 S.Y. <br /> <br />'It:1D'\L <br /> <br />$ 623,000 S.Y. <br /> <br />Pavement crack See 1 i l19: <br />Rumiay: <br />Taxiway and Stubs: <br />ApJ:a1 : <br />Auto Parking and Roads: <br />Herbicides and Awlication: <br />JoDdng: <br />Erceion Control: <br />Misoellanecus : <br /> <br />$ 3,600 <br />600 <br />l,800 <br />600 <br />$ 1,800 <br />2,000 <br />600 <br />l,OOO <br /> <br />m.rAL <br /> <br />$ 12,000 ($lOOO/Month) <br /> <br />'1UIAL Sua: mat a?IRA'.l".IlG JH) ~ RIQJIRF'JER'.l': <br />M::mthly Annual <br /> <br />Operation COst <br />Maintenance COst <br /> <br />$4,l75 <br />l,OOO <br /> <br />$50,100 <br />l2,000 <br /> <br />'roTAL <br /> <br />$5,175 <br /> <br />$62,lOO <br /> <br />9.17 <br />