My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-114
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2007 8:42:16 AM
Creation date
8/28/2007 8:42:16 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Lease
Number
1986-114
Date
9/22/1986
Volume Book
82
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />I <br />I <br />II <br />., <br />¡, <br />¡ <br /> <br />Carroll Morrison <br />Austin. Tx. <br />837-9911 Ext.208 <br /> <br />CON'TRACI AGREPJĹ’1IT : <br /> <br />An agreement is made on this -----Èay of September, 1986, by and between <br />BUILT RIGHT OF TEXAS I hereafter called the Contractor, and CARROLL MORRISON <br />hereafter called the Owner. <br /> <br />Contractor shall erect two Clearspan II aircraft hangars, measuring 45' <br />wide by 37' deep, to be located on lots numbers 1 & 2, as per the attached <br />surveyors plot plan. These hangars are to be located on the San Marcos <br />municipial airport, opposite the city owned T hangars and fronting on the <br />existing taxiway. <br /> <br />I The units are to be constructed of two inch EMT galvanized pipe framework <br />as per plans submitted, and white aluminum diamond ribbed skin, .021" thick. <br /> <br />Hangers are to be anchored to two main concrete piers approximately 8' <br />deep by 12" in dia. with belled or flared bottoms. <br /> <br />A concrete pad, 16' wide, from the front to the rear of the hangar, to <br />be provided for parking of aircraft. <br /> <br />Units will encompass a one piece 45' wide door. that retracts upward into <br />the hangar,~by means of a torsion spring mechanism. I <br /> <br /> <br />A one 110 volt outlet to be provided in each hangar. <br /> <br /> <br />Total contract price is $19.000.00. <br /> <br />Down payment or first draw of $11,000.00 due upon signing of contract. ! <br />: <br /> <br />Balance of $8,000.00 to be divided into two equal payments of $4,000.00 <br /> <br />which are due upon completion each hangar. I <br /> <br /> <br />Completion will be twenty-one working days or less, after the delivery ¡ <br />of materials to the job site, barring any delays not in direct con tro 1 i <br />of Contractor (strikes, act of God, etc.) I <br /> <br />EXHIBIT B I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.