Laserfiche WebLink
<br /> PARAGRAPH V - EQUIPMENT SPECIFICATIONS - JET FUEL <br /> ARTICLE 5 <br /> Above ground tank will be fitted internally with a two inch <br /> floating suction and externally with two inch vent pipe and <br /> vent, an eight inch emergency vent, a two inch fusible link <br /> emergency valve, a one inch lock type water draw off valve, <br /> a three inch manual shut off valve and a three inch fusible <br /> link emergency shut off valve. <br /> ARTICLE 5.1 <br /> Floating suction will OPW model 764, two inch or approved equal. <br /> ARTICLE 5.2 <br /> Emergency vent OPW Model 202F or approved equal <br /> ARTICLE 5.3 <br /> Vent will be OPW number 23 or equal <br /> ARTICLE 5.4 <br /> Fusible link valve will be a Morrison Brothers Number 346DI or <br /> approved equal. <br /> ARTICLE 5.5 <br /> Water draw off will be a Apol1a Series 80 Brass ball valve with <br /> locking handle or equal. <br /> ARTICLE 5.6 <br /> The manual shut off valves will be Morrison Brothers Number 235B <br /> or equal. <br /> NOTE: If contractor chooses to use the existing tank the two <br /> inch manual shut off valve and emergency valve is existing. <br /> PARAGRAPH VI - MISCELLANOUS <br /> The tank farm area will be fenced with a chain link fence four <br /> feet high and with top rail and two gates approximately three <br /> feet wide in fornt of each fueling skid. The gates will be <br /> equipped for padlocks. The tank farm area inside fence will <br /> have a covering of crushed granite. Minimum thickness will be <br /> four inches. Contractor will arranîe and pay for the electric <br /> service required. Contact Pederna es Electrical Coopertive, <br /> Kyle, Texas for the setting of the Utility pole and meter. <br /> Easment for the utility pole will be by the Airport Manager. <br /> The contractor will set a main disconnect circuit breaker <br /> box, the box will contain one 100 amp breaker, and two breakers <br /> for the fuel skid motors, one 30 amp and one sixty amp. The box <br /> will be set on the utility pole below the meter. Wiring from <br /> the breaker box will be in metallic conduit and will be <br /> - Eight - <br />