Laserfiche WebLink
<br /> EXHIBIT "A" <br /> c:4fJiatlo n Ec¡ ulþJn£nt CO. ß nc. <br /> 9. O. !Box 4 <br /> (214J 221-7218 "£a.n.cadn, Cl~x~ 1"46 <br /> City of San Marcos, Texas <br /> Municipal Airport <br /> Proposed revision of existing fuel facility (l-B,OOO gallon <br /> underground tank and one 2,000 gallon underground tank) <br /> Work: To Be Done: <br /> ( 1) Remove existing AvGas fueling equipment(above ground) <br /> (2) Install new pump suction lines with new foot valves <br /> and manifold lines to provide common pump suction. <br /> (3) Install new common fill line for tanks. <br /> (4) Install new seperate vent lines. <br /> (5) Install new water sump pump for each tank. <br /> (6) Install new liquid level gauge line for each tank. <br /> (7) Fabricate new AvGas fuel skid and install on concrete <br /> pad as shown on drawing. <br /> (B) Connect all lines from tanks to new fuel skid. <br /> (9) Wrap all underground pipe with asphaltic type pipe- <br /> wrap and back fill pipes with clean sand. <br /> (10) Level grade above tanks. <br /> ( 11) Relocate existing 10,000 gallon akid tank: to new <br /> location as shown on drawing. <br /> (12) Clean and repaint exterior of skid tank. <br /> (13) Clean interior of tank. <br /> (14) Install new 2" floating suction in skid tank. <br /> (15) Remove existing fuel equipment from skid tank: and <br /> relocate onnew concrete pad as shown on drawing. <br /> (16) Cover tank: farm area with four inch thick crushed <br /> granite. <br /> (17.) Install new chain link fence around perimeter of <br /> tank farm. <br /> (lB) Install proper precautionary signs as recommended by <br /> F.A.A. <br /> (19) Clean area around construction site. <br />