My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-161(a)/Approving ILA w/TSU to reimburse the City 62.1 percent to construct a reclaimed waterline for the Sessom Creek Wastewater improvements
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-161(a)/Approving ILA w/TSU to reimburse the City 62.1 percent to construct a reclaimed waterline for the Sessom Creek Wastewater improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2013 11:13:22 AM
Creation date
11/19/2013 3:18:22 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-161(a)
Date
11/19/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Aaron Concrete Contractors, L <br />Aaron Concrete Contractors, LP <br />4108 Nixon Ln <br />Austin, Tx. 78725 <br />Ph. (512) 926-7326 <br />Fax(512)926 -7875 <br />Change Proposal Cost Summary--01 <br />Project: Sessom Creek Wastewater, Phase II Project Job #: 13046 <br />Estimator: Bob Tomlinson <br />Change File: <br />Date: 8/12/13 <br />Brief Description of Work: 16" Reclaimed Waterline (No Bores) <br />Note: 1 stopped the open cut at the beginning of each bore pit and started back <br />at the end of the each receiving pit. This will allow room for these in the event <br />the bores are installed at a later date. <br />Does this Change affect the Contract Time? If so, number of days ( + / -): 40 <br />UNIT PRICES: <br />SUBTOTAL: 1 1 35,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.