Laserfiche WebLink
<br />EXHIBIT C (Continued) <br />GENE~AL TEQMS AND COND!TIONS <br /> <br />WHOLESALE POWE~ SERVICE <br /> <br />II. <br /> <br />~easureme~t of Demand, E~eray <br />and power F"actor <br /> <br />1. <br /> <br />Measure~e~t of ae~a~d, Enerov and Power Factor <br /> <br />The LC~11, shall provide and maintain equipment for the proper <br />measurement of maximum demand and amount of energy furnished <br /> <br />Qistributor at each separate point of delivery. LC~A may also, <br />at its option, provide equipment to determine power factor. <br /> <br />Shay 1 d th i s meter i ng equ ipment fa i 1 or be found to be 1nacc,u- <br /> <br />rate, the ma~imum demand and amount of energy delivered will be <br /> <br />estimated by LCRA and Distributor from the best <br />available. <br /> <br />information <br /> <br />I) i s t r i but or S hall have the ri 9 h t to i n s t a 11 t e qui P and ma i n - <br /> <br />tain, at 'its own expense, <br /> <br />suHable instruments for measuring <br /> <br />de man d , power fa c to" and en erg y ad j ace n t to l eRA I S me as u r1 n g <br /> <br />devices <br /> <br />devices, <br /> <br />and <br /> <br />lCRA <br /> <br />for <br /> <br />of <br /> <br />check <br /> <br />said <br /> <br />p'Jrposes <br /> <br />on <br /> <br />a <br /> <br />a;'"ees tl1at it Vilill, insofar as practicable, provide suitable <br />facilities for the installation of such metering devices within <br /> <br />its substation enclosures. <br /> <br />(4 ) <br />