Laserfiche WebLink
<br />SECTION B - FACILITY OPERATION CHARACTERISTICS <br /> <br />B.1 <br /> <br />B.2 <br /> <br />B.3 <br /> <br />B.4 <br /> <br />B.5 <br /> <br />B.6 <br /> <br />B.1 <br /> <br />B.8 <br /> <br />B.9 <br /> <br />Number of employee shifts worked per 24-hour day is <br />Average number of employees per shift is <br /> <br />Starting times of each shift: 1st <br /> <br />am <br /> <br />3rd <br /> <br />am <br /> <br />am <br /> <br />2nd <br /> <br />pm <br /> <br />pm <br /> <br />pm <br /> <br />Note: <br /> <br />The following information in this <br />completed for each product line. <br /> <br />must <br /> <br />be <br /> <br />section <br /> <br />Principal product produced: <br /> <br />Raw materials and process additives used: <br /> <br />Production process is: <br />[] Batch [] Continuous [] Both % batch <br />Average.number of batches per 24-hour day <br /> <br />% continuous <br /> <br />Hours of operation: <br /> <br />p.m. <br /> <br />[] continuous <br /> <br />a.m. to <br /> <br />Is production subject to seasonal variation? [] Yes <br />If yes, briefly describe seasonal producation cycle. <br /> <br />[ ] <br /> <br />No <br /> <br />Are any process changes or expansions planned during the next <br />three years? [] Yes [] No <br />If yes, attach a separate sheet to this form describing the <br />nature of planned changes or expansions. <br /> <br />Provide a brief description of existing and proposed sampling <br />ports. <br /> <br />-9- <br />