My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-151
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2007 9:41:30 AM
Creation date
8/28/2007 9:41:30 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1986-151
Date
12/8/1986
Volume Book
84
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1.1 <br /> <br />SCHEMATIC DESIGN PHASE <br /> <br />1.1.1 <br /> <br />The Engineer shall review the program furnished by the Owner to <br /> <br />ascertain <br /> <br />the <br /> <br />requirements <br /> <br />of <br /> <br />the <br /> <br />Project <br /> <br />and <br /> <br />shall <br /> <br />review <br /> <br />the <br /> <br />understanding of such requirements with the Owner. <br /> <br />1.1.2 <br /> <br />The <br /> <br />Engineer <br /> <br />shall <br /> <br />provide <br /> <br />a <br /> <br />preliminary evaluation of the <br /> <br />program and the Project budget requirements, each in terms of the other. <br /> <br />1.1.3 <br /> <br />The Engineer shall review with the Owner alternative approaches <br /> <br />to design and constructiòn of the Project. <br /> <br />1.1.4 <br /> <br />Based on the mutually agreed upon program <br /> <br />and <br /> <br />Project. <br /> <br />budget <br /> <br />requirements, <br /> <br />the <br /> <br />Engineer <br /> <br />shall <br /> <br />prepare, <br /> <br />for <br /> <br />review <br /> <br />by the Owner, <br /> <br />Schematic Design Documents consisting of <br /> <br />dra.wings <br /> <br />and <br /> <br />other <br /> <br />documents <br /> <br />illustrating the scale and relationship of Project components. <br /> <br />1.1.5 <br /> <br />The Engineer shall submit to the Owner a detailed cost estimate <br /> <br />based on current area, volume or other unit costs. <br /> <br />1.2 <br /> <br />DESIGN DEVELOPMENT PHASE <br /> <br />1.2.1 <br /> <br />Based <br /> <br />on <br /> <br />the <br /> <br />Schematic <br /> <br />Design Documents and any adjustments <br /> <br />authorized by the Owner in the program or Project <br /> <br />budget, <br /> <br />the <br /> <br />Engineer <br /> <br />shall <br /> <br />prepare, <br /> <br />for review and approval by the Owner, Design Development <br /> <br />Documents consisting of drawings and other documents to fix and <br /> <br />describe <br /> <br />the <br /> <br />size <br /> <br />and <br /> <br />character <br /> <br />of <br /> <br />the <br /> <br />entire <br /> <br />Project <br /> <br />as to architectural, <br /> <br />structural, mechanical and electrical systems, materials, and such <br /> <br />other <br /> <br />elements as may be appropriate. <br /> <br />1. 2.2 <br /> <br />The <br /> <br />Engineer <br /> <br />shall <br /> <br />submit to the Owner another detailed cost <br /> <br />estimate. <br /> <br />1.3 <br /> <br />CONSTRUCTION CONTRACT DOCUMENTS PHASE <br /> <br />1.3.1. <br /> <br />Based on .the <br /> <br />Design <br /> <br />Development <br /> <br />Documents <br /> <br />and <br /> <br />any <br /> <br />further <br /> <br />adjustments <br /> <br />in <br /> <br />the <br /> <br />scope <br /> <br />or <br /> <br />quality <br /> <br />of <br /> <br />the <br /> <br />project(s) <br /> <br />or <br /> <br />in the <br /> <br />project(s) budget authorized by the Owner, the Engineer shall prepare all <br /> <br />construction contract documents using forms supplied by Owner <br /> <br />(which <br /> <br />do <br /> <br />not <br /> <br />include plans or technical specifications) and construction contract <br /> <br />documents including plans and specifications setting forth in detail <br /> <br />the <br /> <br />t:"equirements <br /> <br />for <br /> <br />construction, <br /> <br />subject <br /> <br />to <br /> <br />review and approval by the <br /> <br />Jwner. <br /> <br />Six (6) sets of such documents shall be submitted to Owner <br /> <br />prior <br /> <br />to authorization of bidding by Owner and seven (7) sets shall be provided <br /> <br />to Owner for execution. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.