Laserfiche WebLink
Cottonwood Creek - 24" Waterline Tie In <br />City of San Marcos <br />Task Description Total Labor Hours Total Loaded Labor Other Direct Costs I <br />Cost <br />A. PRELIMINARY ENGINEERING <br />324 <br />$ <br />$ <br />39,790.00 <br />$ <br />B. DESIGN AND BID DOCUMENT PREPARATION <br />C. RABA - KISTNER ENGINEERING CONSULTANTS <br />804 <br />$ 7,900.00 <br />$ <br />87,550.00 <br />$ <br />C. BID PHASE SERVICES <br />$ <br />58 <br />$ <br />6,470.00 <br />$ <br />D. CONSTRUCTION PHASE SERVICES <br />270 <br />$ <br />30,540.00 <br />$ <br />E. EXPENSES <br />$ 30.454.00 <br />$ - <br />$ <br />- <br />$ 1,088.00 <br />SUB -TOTAL BASIC ENGINEERING SERVICES _ 1456 $ 164,350.00 $ 1,088.00 <br />A. CP &Y ENVIRONMENTAL SERVICES <br />$ 6,010.00 <br />$ <br />B. HORIZON ENVIRONMENTAL SERVICES <br />$ 4,000.00 <br />$ <br />C. RABA - KISTNER ENGINEERING CONSULTANTS <br />$ 7,900.00 <br />$ - <br />D. UNINTECH CONSULTING ENGINEERS <br />$ 12,544.00 <br />$ <br />SUB -TOTAL SPECIAL SERVICES <br />$ 30.454.00 <br />$ - <br />SUB -TOTAL BASIC & SPECIAL SERVICES <br />$ 194,804.00 <br />$ 1,088.00 <br />TOTAL (BASIC & SPECIAL SERVICES & EXPENSES) —_ <br />$ 195,892.00 <br />A. DEVELOPER COORDINATION /CHANGES $ 7,000.00 $ <br />B. EASEMENT /UTILITY COORDINATION $ 2,500.00 $ <br />SUB -TOTAL ADDITIONAL SERVICES $ 9,500.00 $ <br />GRAND TOTAL BASIC, SPECIAL & ADDITIONAL SERVICES, EXPENSES $ 205,392.00 <br />SM Cottonwood.xlsx Page 1 of 7 <br />