Laserfiche WebLink
<br /> PERFORMANCE STATEMENT <br /> Exhibit A <br /> CITY OF SAN MARCOS <br />Contractor shall carry out the following activities in the target area <br />identified on the maps in its 1984 Community Development application. <br />Section 1. FLOOD AND DRAINAGE FACILITIES <br />Contractor shall construct approximately seven hundred and sixty linear feet <br />(760') of open drainage channel, three thousand one hundred linear feet <br />(3,100') of an underground drainage channel, and two (2) concrete culverts in <br />the Mi11view Area of San Marcos. Contractor shall carry out all acquisition <br />of needed easements/ rights-Qf-way in compliance with the Uniform Relocation <br />Assistance and Real Property Acquisition Policies Act of 1970 (42 U.S.C. Sec. <br />4601 et. seq.) and HUD implementing regulations (24 CFR Part 42). This <br />activity shall benefit two thousand eight hundred ten (2,810) persons, of <br />which two thousand three hundred eighty-nine (2,389), or eighty-five percent <br />(85%) are of low to moderate income. Contractor shall utilize the <br />bid/contract process to complete this activity, utilizing Two Hundred <br />Forty-one Thousand Two Hundred Forty and no/100 Dollars ($241,240.00) of <br />contract funds and Two Hundred Sixty Thousand Two Hundred Forty and no/l00 <br />Dollars ($260,240.00) of local funds. <br />Section 2. ARCHITECTURAL/ENGINEERING SERVIC[~ <br /> <br />Contractor shall utilize Eleven Thousand and no/l00 Dollars ($11,000.00) of <br />local funds, to pay for all project related engineering services, including <br />preliminary and final design plans and specifications and all interim and <br />final inspections. <br />Section 3. AOMINISTRATIO~ <br />Contractor shall utilize Thirty Thousand and no/100 Dollars ($30,000.00) of <br />contract funds to carry out all project administration activities, including <br />the cost associated with the required program compliance and fiscal audit. It <br />is further understood that any costs above this contract amount incurred by <br />Contractor for these activities shall be paid for with local funds. <br /> PAGE 1 OF 1 <br />