Laserfiche WebLink
EXHIBIT A <br />AFE No.: Pending <br />Date: 01/16/13 <br />Revised: - <br />By: Rob Koenig <br />Checked: Ed Sangel <br />ROUNDED <br />CODE <br />Encroachment Project - Budget Estimate <br />Project: <br />Lower and Replace San Marcos TBS #1 Line (9033A) at Willow Springs Creek <br />Location: <br />San Marcos, Hays County, Texas <br />Scope: <br />Replace approximately 260 feet of 4 -inch pipeline under a proposed Willow Spring Creek <br />904 <br />Channel Widening Project to accommodate plans by City of San Marcos <br />Owner: <br />Enterprise Products Operating LLC <br />Operator: <br />Enterprise Products Operating LLC <br />Reimbursable: <br />100% Reimbursable to Enterprise <br />AFE No.: Pending <br />Date: 01/16/13 <br />Revised: - <br />By: Rob Koenig <br />Checked: Ed Sangel <br />ROUNDED <br />CODE <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT COST <br />AMOUNT <br />SUB TOTAL <br />SUB TOTAL <br />904 <br />CONTRACT PROJECT MANAGEMENT <br />Project Management <br />120 <br />hours <br />$120 <br />$14,400 <br />Expenses (Air, Hotel, Meals, Car Rental, etc.) <br />1 <br />Lot <br />$500 <br />$500 <br />$14,900 <br />$15,000 <br />905 <br />OUTSIDE ENGINEERING /SURVEY SERVICES <br />Engineering /Drafting <br />1 <br />lot <br />$15,000 <br />$15,000 <br />Survey <br />1 <br />lot <br />$16,000 <br />$16,000 <br />$31000 <br />$31000 <br />907 <br />OUTSIDE INSPECTION SERVICES <br />Inspector- Chief Inspector /COR (based on hourly rat <br />24 <br />days <br />$900 <br />$21,600 <br />Expenses (Mileage, Per Diem, etc) <br />28 <br />days <br />$263 <br />$7,364 <br />X -Ray Crew <br />7 <br />days <br />$2,000 <br />$14,000 <br />$42,964 <br />$43,000 <br />908 <br />EPCO ENGINEERING & INSPECTION <br />Field Engineering - Project Manager <br />16 <br />hours <br />$120 <br />$1,920 <br />Const & Insp Personnel <br />16 <br />hours <br />$85 <br />$1,360 <br />Design Services Personnel <br />16 <br />hours <br />$60 <br />$960 <br />ROW Representative <br />40 <br />hours <br />$90 <br />$3,600 <br />EH &S Personnel <br />16 <br />hours <br />$75 <br />$1,200 <br />Pipeline Controls <br />24 <br />hours <br />$65 <br />$1,560 <br />$10,600 <br />$11,000 <br />935 <br />MATERIAL <br />PIPE 4.500 IN O.D. X 0.237 IN W.T. ERW API 5L -X- <br />40 <br />feet <br />$12 <br />$486 <br />42 FBE 14/16 <br />PIPE 4.500 IN O.D. X 0.237 IN W.T. ERW API 5L -X- <br />280 <br />feet <br />$17 <br />$4,729 <br />42 FBE 14/16 PLUS 30 ARO <br />PIPE 2.375 IN O.D. X 0.218 IN W.T. ERW API 5L- <br />20 <br />feet <br />$8 <br />$164 <br />GR. B BARE <br />MINOR AND MISC. MATERIAL (SEE SEPARATE <br />1 <br />lot <br />$1,021 <br />$1,021 <br />SHEET FOR DETAILS) <br />CLOSURE PIPE VRT 2 IN ANSI 600, W /HINGE, <br />1 <br />ea <br />$179 <br />$179 <br />TO MATCH 2.375" O.D. X 0.218" W.T., XH. <br />VALVE BALL FULL OPENING 4 IN 600 ANSI <br />1 <br />ea <br />$2,236 <br />$2,236 <br />WEXRFFE W /LEVER OPERATOR API 6D <br />VALVE PLUG 2 IN 600 ANSI WEXRFFE W /LEVER <br />1 <br />ea <br />$1,101 <br />$1,101 <br />OPERATOR API 6D <br />4" Stopple Kit c/w with bolts, nuts, gasket, plug, blind <br />1 <br />ea <br />$4,106 <br />$4,106 <br />and T -O -R <br />Temp Line Supplies <br />1 <br />ea <br />$4,000 <br />$4,000 <br />Taxes at 8.25% <br />8.25% <br />of <br />$18,022.78 <br />$1,487 <br />Freight and Misc. (10% of subtotal) <br />10.00% <br />of <br />$18,022.78 <br />$1,802 <br />$21,312 <br />$21,000 <br />947 <br />FENCE <br />Fencing - Move and Replace Chainlink Fence <br />150 <br />feet <br />$25 <br />$3,750 <br />3 750 <br />$4,000 <br />951 <br />LAND & P/L RIGHT OF WAYS <br />Damages and Temp Work Space (Auto Parts) <br />1 <br />lump sum <br />$10,000 <br />$10,000 <br />Damages and Temp Work Space (Hotel) <br />1 <br />1 <br />$10,000 <br />$10,000 <br />$20,000 <br />$20,000 <br />953 <br />ROW ACQUISITION SERVICES <br />Right -of -Way Agent <br />1 <br />lump sum <br />$12,000 <br />$12,000 <br />12 000 <br />$12,000 <br />964 <br />PERMITS, LEGAL & PROF. SERVICES <br />Legal Fee <br />1 <br />lump sum <br />$10,000 <br />$10,000 <br />$10,000 <br />$10,000 <br />979 <br />VEHICLES <br />Company Vehicles <br />1 <br />lot <br />$1,000 <br />$1,000 <br />$1000 <br />$1000 <br />Willow Spring Creek Estimate_ 20130116.xlsx Estimate Pagel of 2 <br />