My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-200/Approving an interlocal agreement w/The Lone Star Rail District to provide funding for passenger rail service to SM by establishing a transporation infrastructure zone
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-200/Approving an interlocal agreement w/The Lone Star Rail District to provide funding for passenger rail service to SM by establishing a transporation infrastructure zone
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:04:05 PM
Creation date
12/20/2013 3:25:16 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-200
Date
12/17/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
there is a possibility that the facilities may be located in San Marcos. However, final location of the <br />facilities is subject to the results of the NEPA process and LSTAR operational needs. Track improvements, <br />curve remediation, and additional track and related infrastructure will be built on the proposed LSTAR <br />route through San Marcos; the number and magnitude of those improvements will be determined <br />through the NEPA and final design processes. LSTAR rail rolling stock will serve San Marcos rail stations. <br />Facilities, line improvements and rolling stock are also subject to available capital budget resources and <br />contracting or purchasing requirements. <br />The LSTAR capital program and service levels will be commensurate respectively with the available capital <br />and operations funding levels. The LSTAR service is planned to be built in stages - LSRD will not delay <br />LSTAR passenger rail service initiation until the completion of the entire passenger rail project, but rather <br />commission and operate a minimum logical service (to be analyzed during the NEPA process), while <br />continuing to bring new segments online as they are completed. Project development may also include <br />the phasing of improvements within a segment in order to allow the initiation of service in a timely <br />fashion with available resources and allowing for ongoing or future development of subsequent phases <br />within a segment toward full completion of planned improvements. It Is provisionally believed by LSRD <br />planners that the system will generally be built and put in operation from north to south, due to the likely <br />capital investment cash flows, the higher projected ridership in the Central Texas region, and fewer <br />construction challenges (based on conceptual engineering analyses). The schedule for Initiation of project <br />development and service provision is to be determined by the completion of the NEPA process and <br />availability of capital funding. <br />Capital cost estimates are preliminary, and are based on the conceptual service development plan <br />(discussed below). Those costs are: <br />* All figures are in millions of dollars and are estimates of not to exceed amounts. <br />it should be noted that the costs above are not additive, but cumulative totals — i.e. to go from Initial to <br />Base Service, the Incremental cost for the entire line Is $140 million ($840 million - $700 million). Capital <br />cost estimates will be further refined during the NEPA process. <br />LSTAR service levels will be commensurate with the available funding from participating local jurisdictions <br />(cities, counties, college districts, etc.). For planning purposes LSTAR has prepared its operations and <br />maintenance (0 &M) projections based on the following conceptual service level goals: <br />Initial Service Goal — 60 minute headway on peak <br />120 minute headway off peak <br />12 total round trips per weekday <br />Weekend and holiday service <br />Base Service Goal — 30 minute headway on peak <br />60 minute headway off peak <br />20 total round trips per weekday <br />Weekend and holiday service <br />Initial Service <br />Base Service <br />Full Service <br />Entire Line <br />$700 * <br />$840 * <br />$1,400 <br />San Marcos Portion of Line <br />$136 * <br />$179 * <br />$263 <br />* All figures are in millions of dollars and are estimates of not to exceed amounts. <br />it should be noted that the costs above are not additive, but cumulative totals — i.e. to go from Initial to <br />Base Service, the Incremental cost for the entire line Is $140 million ($840 million - $700 million). Capital <br />cost estimates will be further refined during the NEPA process. <br />LSTAR service levels will be commensurate with the available funding from participating local jurisdictions <br />(cities, counties, college districts, etc.). For planning purposes LSTAR has prepared its operations and <br />maintenance (0 &M) projections based on the following conceptual service level goals: <br />Initial Service Goal — 60 minute headway on peak <br />120 minute headway off peak <br />12 total round trips per weekday <br />Weekend and holiday service <br />Base Service Goal — 30 minute headway on peak <br />60 minute headway off peak <br />20 total round trips per weekday <br />Weekend and holiday service <br />