Laserfiche WebLink
<br /> APPENDIX B <br /> DETAILED SCOPE OF SERVICES <br /> 1. GENERAL APPROACH <br /> Based upon our discussions with the City of San Marcos staff <br /> personnel, and our similar wastewater system analysis experience, we <br /> ñave developed our approach to the proJect. Our approach will consist <br /> of three primary phases: <br /> 8 Phase I Data Collection and Evaluation <br /> 8 Phase II Generation of Missing Data <br /> 8 Phase III Wastewater System Analysis <br /> The Data Collection and Evaluation Phase will consist of a <br /> detailed evaluation of data pertaining to the existing wastewater <br /> system to determine what information is available. A Phase I report <br /> will be prepared to list necessary data that is missing and to recom- <br /> mend action for obtaining the missing data. <br /> Phase II will include all work required to generate this missing <br /> data. This may include field work (surveying, aerial mapping, etc.) <br /> and office tr.IOrk (updating sewer maps, waste sampling, etc.). It is <br /> anticipated that much of this Generation of Missing Data may be done <br /> by Black & Veatch, City and/or subcontractor personnel, with direction <br /> from Black & Veatch. <br /> After all system data has been collected, the Wastewater System <br /> Analysis Phase will be conducted. This Phase III will include genera- <br /> tion of design flows, transport/treatment evaluation and alternative <br /> selection (to include a computer analysis of the existing and future <br /> collection system) and preparation of the wastewater sys tern analys is <br /> report. <br /> 2. WORK TASK SCHEDULE <br /> PHASE I - DATA COLLECTION AND EVALUATION <br /> - - <br /> Tas k 110-. Collect Available Data <br /> 120. Evaluate Collected Data <br /> 130. Field Inspect Facilities <br /> 140. Recommended Action to Generate Missing Data <br /> 15 <br />