My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1985-026
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1985
>
Res 1985-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2007 4:34:07 PM
Creation date
8/28/2007 4:34:07 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1985-26
Date
3/25/1985
Volume Book
70
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> APPENDIX B <br /> DETAILED SCOPE OF SERVICES <br /> 1. GENERAL APPROACH <br /> Based upon our discussions with the City of San Marcos staff <br /> personnel, and our similar wastewater system analysis experience, we <br /> ñave developed our approach to the proJect. Our approach will consist <br /> of three primary phases: <br /> 8 Phase I Data Collection and Evaluation <br /> 8 Phase II Generation of Missing Data <br /> 8 Phase III Wastewater System Analysis <br /> The Data Collection and Evaluation Phase will consist of a <br /> detailed evaluation of data pertaining to the existing wastewater <br /> system to determine what information is available. A Phase I report <br /> will be prepared to list necessary data that is missing and to recom- <br /> mend action for obtaining the missing data. <br /> Phase II will include all work required to generate this missing <br /> data. This may include field work (surveying, aerial mapping, etc.) <br /> and office tr.IOrk (updating sewer maps, waste sampling, etc.). It is <br /> anticipated that much of this Generation of Missing Data may be done <br /> by Black & Veatch, City and/or subcontractor personnel, with direction <br /> from Black & Veatch. <br /> After all system data has been collected, the Wastewater System <br /> Analysis Phase will be conducted. This Phase III will include genera- <br /> tion of design flows, transport/treatment evaluation and alternative <br /> selection (to include a computer analysis of the existing and future <br /> collection system) and preparation of the wastewater sys tern analys is <br /> report. <br /> 2. WORK TASK SCHEDULE <br /> PHASE I - DATA COLLECTION AND EVALUATION <br /> - - <br /> Tas k 110-. Collect Available Data <br /> 120. Evaluate Collected Data <br /> 130. Field Inspect Facilities <br /> 140. Recommended Action to Generate Missing Data <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.