Laserfiche WebLink
<br /> 5.1.3. RcimbuTsab/~ E:cp~nsu. In addition to payments including a reasonable al1owance for overhead and profit. <br /> provided for in paragraphs 5.1.1 and 5.J.2, OWNER shall Materials and equipment furni~hed by OWNER will. be <br /> pay ENGINEER the actual costs of all reimbursable ex- included at current market praces except used materaals <br /> peoses incurred in connection with aU Basic and Addi- and equipment will be included as if purchased new for <br /> lional Services times a factor of 1. 70. the Project. No deduction is to be made (rom Ef:lG~- <br /> 5.1.4. M used in this paragraph 5.1, the tenDS "Con- NEER's compensation on account of any penalty, Jaqua- <br /> ¡truction Cost," d:yro11 costs" and "reimbursable ex- dated damages, or other amounts withheld from payments <br /> penses" will have meanings assigned to them in para- to Cootractor(s). <br /> graphs S.3.J, 5.3.2 and 5.3.3. <br /> 5.2. Times of Payment. <br /> 5.2. J. ENGINEER shall submit monthly statements for <br /> Basic and Additional Services rendered and for reim- <br /> bursablt' expenses incurred. When compensation is on the <br /> basis of a lump sum or ~rc:cntagc of construction cost <br /> the statements will be based upon ENGINEER's estimate <br /> o( the proponion of the total services actual1y completed <br /> at the time of billing. Otherwise, these monthly statements <br /> will be based upon ENGINEER's rate schedule. <br /> OWNER shall make prompt monthly payments <br /> in response to ENGINEER's monthly statements. <br /> 5.2.2. Where compensation for Basic Services is on the <br /> basis of a lump sum or percentage of Construction Cost. <br /> OWNER shall, upon submi tta lof each phase of Basic <br /> Services, pay such additional amount, if any, as may be 5.3.3. Reimbursable expenses mean the a':fual e~~scs <br /> necessary to bring tolal compensation paid on account of <br /> such phase to the fol1owing percentages of total com- incurred directly or indirectly in connection WI the <br /> pensation for al1 phases of Basic Services: Project for: . . <br /> Ins~rl Actual obtaining bids or proposals from ~<,!ntractor(s); furmsl.., n ~ <br /> Suggt'St~d P~Tc~ntag~ and and maintaining field office facIlitIes; <br /> Phase Rangt> Initial in Margin <br /> tol1 telephone calls and telegrams; repro- <br /> Prcliminary Design ( 5-30%) ----g8-- ~ duction of repons, Drawings and Specifications, ~nd similar <br /> Project-related items in addition to those requued under <br /> Final Design (35-75%) Section I; computer time including an ap~ropriate .char$e <br /> Bidding or Negotiating ( 2-/0%) -----it % (or previously established programs; and, If authonzcd 10 <br /> Construction (/0-20% J -- % advance by OWNER. ovenime work requiring higher than <br /> TOTAL X 100% regular rates. <br /> 5.3.4. If OWNER fails to make any payment due EN- <br /> GINEER for services and expenses within 45 days after <br /> receipt of ENGINEER's bill therefor, the amounts ld'1/2 <br /> ENGINEER shall include a charge at the rate of <br /> 5.3. CrneraL per month from said 45 th day, and in addition EN- <br /> GINEER may, after giving seven days' written notice to <br /> 5.3.1. The canstruction cost of the entire Project (herein OWNER, suspend se'rvices under this Agreement _until he <br /> referred to as "Construction Cost")' means the total cost has been paid in full all amounts due him for servIces and <br /> of the entire Project to OWNER, but it will not include expenses. <br /> ENGINEER's compensation and expenses, the cost of .5.3..5. If this Agreement is terminated by OWNER upon <br /> land, rights-of-way. or compensation for or damages. to the completion of any phase of the Basic Services. progress <br /> propenies unless this Agreement so specifies, nor will it payments due ENGINEER for services rendered thr~ugh <br /> include OWNER's legal. accounting, insurance counseling such phase shall constitute total payment for such ~rvlces. <br /> or auditing services, or interest and financing charges in- If this Agreement is terminated by OWNER during any <br /> curred in connection with the Project. When Construction phase of the Basic Services, ENGINEER will. be raid for <br /> Cost is used as a basis for payment it will be hased on one services rendered during that phase on the basIs 0 <br /> of the following sources with precedence in the order Sect' on 7. 1 . . f!>r service~ re.ndered during <br /> listed: iliat phase to date of termmatlon by pnnclpals and em- <br /> 5.3.1.1. For completed construction the total cost of ployees assigned to the Project. In the event of any term i- <br /> all work performed as designed or specified by ENGI- nation, ENGINEER will be paid for all unpaid Addition~1 <br /> NEER. Services and unpaid re.im~ursable expenses, plu~ al1 lerml- <br /> .5.3.1.2. For work not constructed, the lowest bona nation expenses. TerminatIon expenses mean reimbursable <br /> expenses directly attributable to termination, which shall <br /> fide bid received from a qualified bidder for such work; include an amount computed as a percentage of total com- <br /> or if the work is not bid, the lowest bona fide negotiated pensation for Basic Services earned by ENGINEER to <br /> proposal for such work. the date of termination, as fonows: <br /> 5.3.1.3. For work for which no such bid or proposal 20% if termination occurs after commencement of the <br /> is received. ENGINEER's most recent opinion of prob- Preliminary Design Phase but prior to commencement of <br /> able Project Cost. the Final Design Phase; or <br /> Labor furnished by OWNER for the Project will be in- 10% if tennination occurs after commencement of the <br /> eluded in the Construction Cost at current market rates FinaJ .Design Phase. <br /> Page 6 of .-..~... pages <br />