My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1985-034
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1985
>
Res 1985-034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2007 9:18:20 AM
Creation date
8/29/2007 9:18:20 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1985-34
Date
4/8/1985
Volume Book
70
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Contractar(s) when subslitution i~ permitted b)' the Con. <br /> tract Documents, <br /> J.3. PrrlimlnarJ Deilgn Pba!>t:. 1.5.4. Assist OWNER in evaluating bid) or propo:':Jh <br /> After written authorization to proceed with the Preliminary and in anembling and awardins contracls. <br /> Design Phase, ENGINEER shall: 1.6. Construction Phase. <br /> 1.3.1. In consultation with OWNER During thc Construction Phase ENGINEER shall: <br /> determine the scope of the Project. 1.6.1. Consul I with and advisc OWNER and act as ~is <br /> 1.3.2. Prepare preliminary design documents consisting representative as provided in Articles .1, throu1!h 17. JO- <br /> of final design criteria, preliminary drawings and outline elusive of the Standard Gcneral Condition.. of the Con- <br /> specifications. structi~n Contract, National Society of Profe!Osional En- <br /> (!ineers document 19 J 0-8, 1974 edition; the exten~ and <br /> 1.3.3. Based on the information contained in the pre. limitations of the duties. responsibilities and authorIty of <br /> liminar) design documents, submit a revised opinion of ENGINEER as assigned in said Standard General C~ndl- <br /> probable cost for the Project including Construction Cost, tions shall not be modified without ENGINEER'. wnllen <br /> contingencies, compensation for all profusionals and con- consent. all of OWNER's instructions to Contractor(s) will <br /> sultants, costs of land, rights-of-way and compensation for be issu~d through ENGINEER who will have authority 10 <br /> or damages to properties and interest and financing charges act on behalf of OWNER to the extent provided in said <br /> (all of which are hereinafter called "Project COSIs"). Standard General Conditions except as othcrwise provided <br /> 1.3.4. Furnish five copies of the above preliminary design in wriling. <br /> documents and present and review them in person with ] .6.2. Make periodic visits to the site to observe as an <br /> OWNER. experienced and qualified design professional the pr.o~re~s <br /> 1.4. Final.Duign Pha.töe. and quality of the executed work and to deler~tne 1ß <br /> general if the work js proceeding in accord~nce wIth the <br /> After written authorization to proceed with the Final De. Contract Documents; he shall not be reqUIred to make <br /> sign Phase, ENGINEER shall: exhaustive or continuous on-site inspections to check the <br /> quality or quantity of work; he sha1l not be responsible for <br /> 1.4.1. On the basis of the accepted preliminary design the means, methods, techniques, sequences or procedures <br /> documents prepare for incorporation in the Contract Docu- óf construction selected by Conlractor(s) or the safety <br /> menU, final drawings to show the character and scope of 'precautions and programs incident to the work of ~~n- <br /> the work to be performed by contractors on the Project tractor(s). His efforts will be directed toward provldmg <br /> (hereinafter called "Drawing~"), and Specifications. assurance for OWNER that the comp1eted Project will <br /> J .4.2. Furnish to OWNER such documents and design conform to the Contract Documents, but he sha1i not be <br /> responsible for the failure of Contraclor(s) to perform the <br /> data as may be required for, and assist in the preparation construction work in accordance with the Contract Doeu- <br /> of. the required documents so that OWNER may obtain ments. During such visits and on the basis of his on-site <br /> approvals of such governmental authorities as have juris- observations he shall keep OWNER informed of the <br /> diction over design crileria applicable to the Project, and pro~ress of the work. shall endeavor to g\lard OWNER <br /> assist in obtaining such approvals by participating in sub- a~ainst defects and deficiencies in the work of Contractor(s) <br /> missions to and negotiations with appropriate authorities. and may disapprove or reject work as failing to conform <br /> ].4.3. Advise OWNER of any adjustments to his latest to the Contract Documents. <br /> opinion of probable Project Cost caused by changes in 1.6.3. Review and approve Shop Drawings (as that term <br /> scope, design requirements or Construction Costs and is defined in the aforesaid Standard General Conditions) <br /> furnish a revised opinion of probable Project Cost based and samples, the results of tesls and inspections and other <br /> on the Drawings and Specifications. data which any. Contractor is required to submit. hut only <br /> ].4.4. Prepare bid forms, nolice to bidders, instructions for conformance with the design concept of the Prí'ject <br /> to bidders, general conditions and supplemcnlary condi- and compliance with the information given in the Contract <br /> tions. and assist in the preparation of other related docu- Documents; determine the acceptability of substitute ma- <br /> ments. terials and equipment proposed by Contraclor(s); and re- <br /> 1.4.5. Furnish five copies of the above documents and ceive and review (for general content as required by the <br /> Specifications) maintenance and operaling instructions, <br /> present and review them in person with OWNER. schedules. guarantees, bonds and certificates of inspection <br /> 1.5. Bidding or Negotiating Phase. which are to be assemhled by Contractor(s) in accordance <br /> with the Contract Documents. <br /> After written authorization to proceed with the Bidding or 1.6.4. Issue a1l instructions of OWNER to Contractor(s); <br /> Negotiating Phase, ENGINEER shall: prepare routine change orders as required; he may. as <br /> 1.5.1. Assist OWNER in obtaining bids or negotiating OWNER's representative, require special inspection or <br /> proposals for each separate prime contract for construc- testing of the :work; he shall act as interpretcr of the <br /> tion or equipment. requirements of the Contract Documents and jlld~e of Ihe <br /> performance thereunder by the parties thc:reto an<;J sha1l <br /> 1.5.2. Consult with and advise OWNER as to the accept- make decisions on all claims of OWNER and Contractor(s) <br /> ability of subcontractors and other persons and organiza- relating to the execution and progress of the work and all <br /> tions proposed by the prime contractor(s) (hereinafter other matters and questions related thereto; but EN- <br /> ca1led .'Contractor(s)") for those portions of the work as GINEER sh;¡) not be liable for the results of any such <br /> to which such acceptability is required by the Contract interpretations or decisions rendered by him in good failh. <br /> Documents. 1.6.5. Based on his on-site observations as an experienced <br /> 1.5.3. Consult with and advise OWNER as to the accept- and qualified design. professional and on his review of <br /> ability of substitute materials and equipment proposed by Contractor(sr applications for payment and the accom- <br /> Page 2 of 8 pages <br /> ......., <br />
The URL can be used to link to this page
Your browser does not support the video tag.