Laserfiche WebLink
<br /> respect to materials. equipment, clements and systems <br /> pertinent to ENGINEER's services. <br /> 3.10. Give prompt written notice to ENGINEER when- <br /> ever OWNER observes or otherwise becomes aware of <br /> any defect in the ProjecL <br /> 3.11. Furnish approvals and permits from all govern- <br /> mental authorities having jurisdiction over the Project and <br /> such approvals and consents from others as may be neces- <br /> sary for completion of the Project. <br /> 3.12. Furnish. or direct ENGINEER to provide. neces- <br /> sary Additional Services as stipulated in Section 2 of this <br /> Agreement or other services as required. <br /> 3.13. Bear all costs incident to compliance with the re- <br /> quirements of this SectioD 3. <br /> SECTION 3-OWNER'S RESPONSIBILITIES SECTION 4-PERIOD OF SERVICE <br /> OWNER shall: 4.1. The provisions of 4.2 through 4.8, inclusive, and <br /> 3.1. Provide full information as to his requirements for the various rates of compensation for ENGINEER's serv- <br /> the Project. ices provided for elsewhere in this Agreement hav~ been <br /> agreed to in anticipation of the orderly and contmuous <br /> 3.2. Assist ENGINEER by placing at his disposal all progress of the Project through completion of the Con- <br /> available information pertinent to the Project including struction Phase. ENGINEER's obligation to render serv- <br /> previous reports and any other data relative to design and ices hereunder will extend for a period which may reason- <br /> construction of the ProjecL ably be required for the design, award of contracts and <br /> 3.3. Furnish to ENGINEER. as required by him for construction of the Project including extra work and <br /> performance of his Basic Services. data prepared by or required extensions thereto. <br /> services of others. such as core borings, probings and sub- <br /> surface explorations. hydrographic surveys, laboratory tests <br /> and inspections of samples. materials and equ~ent; ap- <br /> propriate professional mterpretations of all 0 the fore- <br /> going; property. boundary, casement, right-of-way. topo- 4.3. <br /> graphic and utility surveys and property descriptions; <br /> zoning and deed restriction; and other special data or upon written authorization from <br /> consultations not covered in paragraph 2.1; all of which <br /> ENGINEER may rely upon in performing his services. OWNER, ENGINEER shall proceed with the performance <br /> of the services called for in the Preliminary Design Phase, <br /> 3.4. Provide engineering surveys to enable Contractor(s) and shall submit preliminary design documents tfd a <br /> to proceed with their work. revised opinion of probable Project Cost within _1_- <br /> 3.5. Guarantee access to and make all provisions for calendar days f01lowing the authorization to proceed with <br /> ENGINEER to enter upon public an,d private property as that phase of se}óVices. <br /> required for ENGINEER to perform his services. 4.4. After acceptance by OWNER of the prctiminary <br /> 3.6. Examine all studies. reports, sketches, Drawings, design documents and revised opinion of probable Project <br /> Cost, indicating any specific modifications or changes in <br /> Specifications, proposals and other documents presented by scope desired by OWNER. and upon written authorization <br /> ENGINEER, obtain advice of an attorney, insurance from OWNER. ENGINEER shall proceed with the per- <br /> counselor and other consultants as he deems appropriate formance of the services called for in the Final Design <br /> for such examination and render in writing decisions Phase, so as to deliver Contract Documents and a revised <br /> pertaining thereto within a reasonable time so as not to opinion of probable Pro~Bt Cost for all authorized work <br /> delay the services of ENGINEER. on the Project within ---------- calendar days after the <br /> 3.7. Pay all costs incident to obtaining bids or proposals authorization to proceed with that phase of services. <br /> from contractors. 4.5. ENGINEER's services under the <br /> 3.8. Provide such legal, accounting. independent cost Phase, Preliminary Design Phase and Final Design Phase <br /> estimating and insurance counseling services as may be shall each be considered complete <br /> required for the Project, and such auditing service as date when the submissions for that phase have: been ac- <br /> OWNER may require to ascertain how or for what pur- cep_ted by OWNER. <br /> pose any contractor has used the moneys paid to him <br /> under the construction contract. <br /> 3.9. Designate in writing a person to act as OWNER's <br /> representative with respect to the work to be performed <br /> under this Agreement Such person shall have complete <br /> authority to transmit instructions. receive information, 4.6. After acceptance by OWNER of the Contract Docu- <br /> interpret and define OWNER's policies and decisions with ments and ENGINEER's most recent opinion of probable <br /> Page 4 of -_.~-_. pages <br />