Laserfiche WebLink
<br /> BLACK Ii VEATCH <br /> APPENDIX C <br /> CITY OF SAN MARCOS <br /> WASTEWATER SYSTEM ANALYSIS <br /> DETAILED SCOPE OF SERVICES <br />PHASE II - GENERATION OF ADDITIONAL SYSTEM DATA <br /> - - <br />Group 100. Field Surveying <br />Task 110. Identify Critical Manhole Locations to be Surveyed. <br /> 120. Assimilate Surveyed Location, Elevation, and Pipe Size <br /> Data into the Overall Collection System Skeletonized Map. <br />Group 200. Flow Measurement <br />Ta 210. Identify Locations for Flow Measurement Stations. <br /> 220. Evaluate Flow Data. <br /> 230. Compile Flow Data and Submit Data Report to City. <br />PHASE III - WASTEVATER SYSTEM ANALYSIS <br />Group 100. Population and Land Use <br />Task 110. Meet with City Staff to Establish Criteria for Projecting <br /> Population and Land Use. <br /> 120. Define Study Area and Divide into Subbasins. <br /> 130. Population Projections for 1990, 2005, and Ultimate and <br /> Disaggregation of Existing and Future Projections to be <br /> Done by City Planning. <br /> 140. Meet with City Staff for Review. <br />Group 200. Generation of Design Flows <br />Task 210. Determine Existing Peak and Average Flow Criteria. <br /> 220. Disaggregate Current Metered Vater Use Data by Subbasin. <br /> 230. Evaluate Field Wastewater Flow Measurements from Previous <br /> Studies and from Phase II of this Study. <br />