Laserfiche WebLink
<br /> EXHIBIT B - MAXWELL TO SAN MARCOS <br /> (SEPTEMBER~ 1985) <br /> AHEA 1/ 7-B <br /> DWG " I DESCRIPTION UNIT COST TOTAL COST <br /> - <br /> D-3 6" 9,750' 1.30 $ 12,675.00 <br /> 6" G.V. 1 135.00 135.00 <br /> 6" Bore 60' 15.00 900.00 <br /> 6" 23,657' 2.42 57 ,249.9l~ 1981 <br /> 4" G.V. 1 115.00 115.00 <br /> IOu Bore 30' 24.25 727.50 1981 <br /> 6" Bore 30' 19.1~2 582.60 <br /> E-3 6" Bore 56' 15.00 840.00 <br /> 4" G.V. 1 115.00 115.00 <br /> 10" Bore 50' 24.25 1,212.50 1981 <br /> F.Y. 1 140.00 140.00 1981 <br /> F-3 4" 3,900' .80 3,120.00 <br /> 6" Bore 30' 15.00 450.00 <br /> 6" Bore 65' 15.00 975.00 <br /> 6" Bore 40' 15.00 600.00 <br /> 6" Bore 26' 15.00 390.00 <br /> 6" G.V. 1 311.00 311. 00 1981 <br /> F.V. 1 75.00 75.00 <br /> 6" Bore 20' 15.00 300.00 <br /> $ 80,913.54 <br /> 1970 AND/OR 1981 ADDITIONS <br /> 40 Year Depreciation Schedule <br /> 7B Items to be transferred only after all items of 7A have been <br /> transferred to San Marcos. <br />