My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 1985-117
San-Marcos
>
City Clerk
>
02 Ordinances
>
1980 s
>
1985
>
Ord 1985-117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2007 9:22:37 AM
Creation date
8/30/2007 9:22:37 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Emergency Approval
Number
1985-117
Date
11/25/1985
Volume Book
74
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Dr. Kent Butl er October 21, 1985 <br /> Page 7 <br /> the allocation. During the hour of the maximum flow in the main spine, <br /> the flow to the Northeast Pressure Plane was compared to the total flow in <br /> the line, and the cost shares have been distributed accordingly. It is <br /> recommended that these shares be considered as fixed, with no adjustment <br /> made for minor changes in growth projections. <br /> Pipelines are designed for relatively long design periods, making it <br /> appropriate for future growth to contribute as well as initial customers. <br /> It is therefore recommended that these costs be allocated within each <br /> pressure plane on the basis of the LUEs projected for 2005. <br /> COST SUMMARY <br /> A summary of estimated construction costs follows, allocated bet\oleen the <br /> two MUDs and other areas proposed to be served by the City of San Marcos. <br /> The derivation of these estimated costs is presented in Appendix B. These <br /> estimates are based on general estimates of unit costs provided by Espey, <br /> Huston and Associates and are for planning purposes only. More reliable <br /> estimates can be made as the detailed design of each faci 1 ity is <br /> completed. All costs are in 1985 dollars. <br /> Estimated Construction Costs <br /> 1990 1995 2005 <br /> - - - <br /> Rivergate MUD $1,433,840 $2,144,540 $4, 111 ,340 <br /> Hi gh Ridge ~1UD 1,752,660 1,760,460 643,430 <br /> Other 646,700 1,649,610 3,312,140 <br /> (City of San Marcos) <br /> TOTAL $3,833,200 $5,554,610 $ 8,066,910 <br /> GRAND TOTAL $17,454,720 <br /> The proposed facilities are based on long-term estimates of future growth <br /> and are subject to considerable changes. Growth patterns and other <br /> factors should be reviewed a short time before the design of any major <br /> facilities, to ensure the efficient use of funds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.