Laserfiche WebLink
<br /> where: <br /> L9S$ = 1995 LPP cost share factor <br /> LOS$ = 200S lPP cost share factor <br /> U9S$ = 1995 UPP cost share factor <br /> UOS$ = 2005 UPP cost share factor <br /> A$ = Rivergate share of 3.0 MG tank cost <br /> C$ = Other snare of 3.0 MG tank cost <br /> (4) 2.0 MG standpipe at High Ridge (1995) <br /> B$ = BN£O5 - BNE90 C$ = CNEO5 - CNE90 <br /> NEûS - NEgO NEO5 - NE90 <br /> where: <br /> BNEOS = 2005 NEPP High Ridge LUE's <br /> NE05 = 2005 NEPP Total LUE's <br /> .....ett. <br /> ( 5) 2.0 MG storage tank near Rivergate (2005) <br /> Distribute according to additional needs between 1995 <br /> and 2005 as determined above for 3.0 MG tank: <br /> L$ = SLOS U$ = SU05 <br /> - - <br /> ~05 STO5 <br /> A$ = AlOS - AL95 AU05 - AU95 <br /> L$ + U$ <br /> LOS - L95 UO5 - U95 <br /> C$ = CLOS - CL95 CU05 - CU95 <br /> L$ + U$ <br /> LOS - L95 U05 - U95 <br /> A-4 <br />