Laserfiche WebLink
<br /> TABLE 4A. Vi ASTEW A TER SYSTEM IMPROVEMENTS <br /> AND COST ESTI MA TES *: <br /> YEAR 1990 IMPROVEMENTS <br /> DESCRIPTION QUANTITY UNIT PRICE COST* <br /> 24-inch interceptor pipe <br /> (west of IH 35) 7000 ft $96 $672,000 <br /> t 8-inch interceptor pipe <br /> (east of IH 35) 5000 ft. $72 $360,000 <br /> 27- Î[ìch i[ìterceptor pipe 4500 ft $108 $486,000 <br /> 30-i[ìch i[ìterceptor pipe 4500 ft $120 $540,000 <br /> Lift Station <br /> (at treatme[ìt pla[ìt) 1400 gpm $\40 $196,000 <br /> un StaUo" (we.st of lH 35) 1000 gpm $140 $140,000 <br /> Treatment p1a[ìt 0.6 mgd $2 $1,200,000 <br /> TOT At CONSTRUCTION COST $3.594.000 <br /> * Does not include engineering or cant ingencies. <br />