Laserfiche WebLink
<br /> TABLE 7C. CONSTRUCTION COST ALLOCATIONS <br /> 2005 Improvements <br /> Lift Stations <br /> Sink Creek, 460 gpm <br /> C = 1.0 X $46,000 = $46,000 <br /> South of Wastewater Treatment Plant, 800 gpm <br /> C = 1.0 X $80,000 = $80,000 <br /> At Wastewater Treatment Plant, 4,000 gpm <br /> A = 3340/7934 X $440,000 = $185,228 <br /> B = 552/7934 X $440,000 = $30,613 <br /> C = 4042/7934 X $440,000 = $224,1 S9 <br /> West of tH 35, 2,750 gpm <br /> A = 0.8937 X $330,000 = $294,921 <br /> C= 0.1063 X $330,000 = $35,079 <br /> Wastewater Treatment Plant, 2.4 mgd <br /> A = 3340/7934 X $4,800,000 = $2,020,671 <br /> B = 552/7934 X $4,800,000 = $333,955 <br /> C = 4042/7934 X $4,800,000 = $2,445,374 <br />