Laserfiche WebLink
<br /> where: <br /> AU90 $ = Rivergate share of 1990 UPP pumping costs <br /> CU90 $ = Other share of 1990 UPP pumping costs <br /> BNE90 $ = High Ridge share of 1990 NEPP pumping costs <br /> . . . etc. <br /> D. Transmission Pipelines <br /> (1) Main Spine Pipeline <br /> Split according to portion of maximum flow: <br /> LPP NEPP <br /> - - <br /> 30" line (3.0 MG tank to Post Road) .6307 .3693 <br /> 24" line .4781 .5219 <br /> 20" line to I.H. 35 .2411 .7589 <br /> 20" line across I.H. 35 .1303 .8697 <br /> (2) Other pipelines to be funded entire1y by the <br /> pressure plane served. <br /> For the pipeline costs, the costs assigned to each pressure plane shall be <br /> allocated according to the following factors: <br /> AL $ = ALaS BL $ = 0 CL $ = CLOS <br /> - - <br /> LOS LO5 <br /> AU $ = AUOS BU $ = 0 Cu $ = CUDS <br /> - - <br /> U05 U05 <br /> ANE $ = 0 BNE $ = BNEO5 CNE $ = CNE05 <br /> NEOS NEOS <br /> A-6 <br />