<br /> D. Residential land uses represent 3, 6, and 17 LUEs per acre for <br /> low, medium, and high density housing, respectively <br /> E. Comercial and industrialland uses represent 5 LUEs per acre <br /> 5. Projected wastewater flows for the service area were generated for <br /> 5-year, ! a-year, 20-year planning horizons (years ending 1990, 1995, and <br /> 2005) and ultimate buildout based on the projected land use buildout <br /> schedu I es. <br /> ìhe pÎoje~ted lUE. demands and wastewater flows for each planning <br /> horizon and for each entity are presented in Table 3. <br /> 6. A preliminary design for faciHties, including phasing of construction, <br /> was prepared in order to meet the projected wastewater demand for the <br /> 20-year planning horizon. The plan includes two gravity interceptors serving <br /> both sides of IH 35 and a combined interceptor leading to the wastewater <br /> treatment plant site. Lift stations and force mains will be required to serve <br /> the areas west of IH 35 and within the North San Marcos Service Area, as welJ <br /> as the area to the south of the Municipal Airport The proposed treatment <br /> plalìt site is ilì the v\cilìity of the muf",cipa1 airport on the unnamed tributary <br /> of the San Marcos River (see attached map). <br /> 7. Colìstruction cost estimates were calculated for each facility. The <br /> estimates were based on unit costs for facility components in 1985 dollars. <br /> Coot ingency costs of 15% and engineering costs of 10% of construct ion were <br /> included. The specific faci HUes and their estimated construction costs for <br /> the 5-year, 'O-year and 20-year p\aming horìzons are presented in Tables <br /> 4A, 48, 4C and 5. <br /> The interceptor pipeline is to be instaHed at fun size inittal\y to avoid <br /> the added cost of constructing paraHel rel1ef Hoes in the future. The <br /> wastewater treatment plant and lift stations are to be built in phases, with <br /> additional capacHy constructed every five to ten years. By 1995, lift <br /> c;t.3tion~ and force mains serving the Sink Creek basin and south of the <br /> wastewater treatment plant are to be constructed. The force mains serving <br /> these areas are to be overslzed lnltially to avoid the added cost of parallel <br /> relief malns. <br /> -3- <br />