|
<br /> TABLE 7A. CONSTRUCTION COST ALLOCATIONS*
<br /> -A a = Rjvergate MUDs * Does Not 'nclude
<br /> -8- = Hjghridge MUDs Contingencies or
<br /> -C' = City of San Marcos Engjneering
<br /> 1990 Improvements
<br /> Interceptors
<br /> 24- Interceptor (West of IH 35), 7,000 ft.
<br /> A = 0.8937 X $672,000 = $600,566
<br /> C = 0.1063 X $672,000 = $71,434
<br /> 18- Interceptor (East of IH 35), 5,000 ft.
<br /> 8 = 1.0 X $360,000 = $360,000
<br /> 27- Combined Interceptor, 4,500 ft.
<br /> A = 63461' '569 X $486,000 = $266,588
<br /> 8 = 3180/1 1569 X $486,000 = $ f 77 C'"88
<br /> : .J.) .)
<br /> C = 2043/11569 X $486,000 = $85,824
<br /> 30- Combined Interceptor, 4,500 ft.
<br /> A = 6346/11569 X $540,000 = $296,209
<br /> 8 = 3180/11569 X $540,000 = $148,431
<br /> C = 4562/11569 X $540,000 = $95,360
<br /> lift Stations
<br /> At Wastewater Treatment Plant, 1,400 gpm
<br /> A = 839/ 1898 X $196,000 = $86,641
<br /> B = 996/ 1898 X $ 1 96,000 = $102,854
<br /> C= 63/1898 X $196,000 = $6,506
<br /> West of IH 35, 1,000 gpm
<br /> A = 1.0 X $140,000 = $140,000
<br /> Wðstewðter Treatment Plant, 600,000 gpd
<br /> A= 839/1898 X $1,200,000 = $530,453
<br /> B = 996/1898 X $1,200,000 = $629,715
<br /> c= 63/1898 X $1,200,000 = $39,831
<br />
|