Laserfiche WebLink
<br /> Table 8. Summary of Construction Costs <br /> R i vergete Hi ghri dge City Tote) Cost <br /> MUDs MUDs <br /> 1990 1,920,457 I ,374,588 298,955 3,594,000 <br /> 1995 1,558,679 1,012,331 877,490 3,448,500 <br /> 2005 2,500,819 364,568 2,830,612 5,695,999 <br /> Subtotal 5,979,955 2,751,487 4,007,057 12,738,499 <br /> 15" Contingencies 896,993 41 2,723 601,059 1,910,775 <br /> 1 O~ Engi neeri ng 687,695 316,421 460,812 1,464,927 <br /> T otel 7,564,643 3,480,631 5,068,927 16,114,201 <br />