Laserfiche WebLink
<br /> WASTEWATER SERVICE tlASTER PLAN <br /> FOR THE NORTH SAN I1ARCOS AREA <br /> This wastewater master plan presents the major wastewater facility <br /> Improvements and cost estImates needed over the next twenty years for the <br /> North San Marcos Service Area. The service area, shown on the accompanying <br /> map. comprises approximately 16,224 acres or 25 square mnes, al1 within <br /> the extraterritorial jurisdiction or corporate Hmits of the City of San Marcos. <br /> It extends from the southern 11m its of the City of Kyle extraterritorial <br /> Jurisd~ction (ETJ) into the northern corporate 11m its of the City of San <br /> Marcos. Table 1 indicates the watersheds MId acreages which would be <br /> servable within the North San Marcos Service Area. <br /> Planning and engineering consultants represent ing the City and various <br /> development interests collaborated with City staff over several months to <br /> develop a worKable and economical plMl for wastewater service, based on <br /> reaHsUc marKet absorption and buildout schedules. Most of the design and <br /> cost computations for this plan were performed by Espey Huston and <br /> Associates, consulting engineers. Overall coordinat1on of the plan was <br /> performed by the City's consult ing planners, Kent S. Butler and Associates. <br /> The assumpHons, design calculations and preHminary plans were reviewed by <br /> BlacK and Veatch, Inc., the City's consulting wastewater engineers. <br /> Espey Huston and Associates served as consultant for the proposed <br /> "Rivergate M.U.D.s" (or the San Marcos Municipal Utility District Nos. 1 and 2). <br /> which are proposed to be developed by Storm Development. Inc. The Rivergate <br /> tract covers approximately 1,345 acres along the west side of IH 35 and <br /> withio the Service Area. The consultants for the proposed "Highridge M.U.D.s" <br /> (or the Hays County M.U.D. Nos. 2 and 3), which are proposed to be developed by <br /> Mclester Grisham and Gardner Development Corp., also contributed extensively <br /> to this plan. The Highridge tract comprises approximately 514 acres along <br /> the east side of IH 35 and within the Service Area. The consulting engineers <br /> for Highridge M.U.D.s are J. W. French and Associates. <br /> It is ant icipated that the City of San Marcos, Rivergate M.U.D.s and <br /> Mighridge M.U.D.s will be the participating entitttes in the construction and <br /> financing of the wastewater utl11ty for the North San Marcos Service Area. <br />