Laserfiche WebLink
<br /> WASTEWATER SERVICE t1ASTER PLAN <br /> FOR THE NORTH SAN MARCOS AREA <br /> This wastewater master plan presents the major wastewater facility <br /> improvements and cost est tmates needed over the next twenty years for the <br /> North San Marcos Service Area. The service area, shown on the accompanying <br /> map, comprises approximately 16,224 acres or 25 sQUare miles, all within <br /> the extraterritorial jurisdict ton or corporate Hmits of the City of San Marcos. <br /> It extends from the southern limits of the City of Kyle extraterritorial <br /> jurtsdict ion ([1 J) into the northern corporate limits of the City of San <br /> Marcos. Table 1 indicates the watersheds and acreages which would be <br /> servable within the North San Marcos Service Area. <br /> Planning and engineering consultants represent ing the City and various <br /> development interests collaborated with City staff over several months to <br /> develop a workable and economical plan for wastewater service, based on <br /> reaHstic market absorpt ton and buHdout schedules. Most of the design and <br /> cost computations for this plan were performed by Espey Huston and <br /> Associates, consulting engineers. Overall coordination of the plan was <br /> performed by the City's consulting planners, Kent S. BuUer and Associates. <br /> The assumptions, design calculations and preliminary plans were reviewed by <br /> Black. and Veatch, Inc., the City's consulting wastewater engineers. <br /> Espey Huston and Associates served as consultant for the proposed <br /> "Rivergate M.U.D.s" (or the San Marcos Municipal Ut iHty District Nos. 1 and 2), <br /> which are proposed to be developed by Storm Development, Inc. The Rivergate <br /> tract covers approximately 1,345 acres along the west side of IH 35 and <br /> within the Service Area. The consultants for the proposed "Highridge M.U.D.s. <br /> <or the Hays County M.U.D. Nos. 2 and 3), which are proposed to be developed by <br /> Mclester Grisham and Gardner Development Corp., also contributed extensively <br /> to this plan. The Highridge tract comprises approximately 514 acres along <br /> the east side of IH 35 and within the Service Area. The consu1t1ng engineers <br /> for H1ghrtdge M.U.D.s are J. W. French and Associates. <br /> It is ant 1c1pated that the C1ty of San Marcos, Rivergate M.U.D.s and <br /> Mighridge M.U.D.s will be the part1cipating entitites 1n the construction and <br /> financing of the wastewater utlHty for the North San Marcos Servtce Area. <br />