My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 1985-120
San-Marcos
>
City Clerk
>
02 Ordinances
>
1980 s
>
1985
>
Ord 1985-120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2007 11:14:48 AM
Creation date
8/30/2007 11:14:48 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Emergency Approval
Number
1985-120
Date
11/25/1985
Volume Book
75
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> TABLE 4A. W ASTEW A TER SYSTEM iMPROVEMENTS <br /> AND COST ESTIMATES* <br /> YEAR 1990 IMPROVEMENTS <br /> DESCRIPTION QUANTITY UNIT PRICE COST* <br /> 24-tnch interceptor pipe <br /> (west of tH 35) 7000 ft $96 $672.000 <br /> 1 a-inch interceptor pipe <br /> (east of tH 35) 5000 ft. $72 $360.000 <br /> 27-inch interceptor pipe 4500 ft. $\08 $486.000 <br /> 30-inch interceptor pipe 4500 ft. $\20 $540.000 <br /> Uft Station <br /> (at treatment p\aot> 1400 gpm $140 $196.000 <br /> un 5tat\on (west of LH 35) \ 000 gpm $140 $ \ 40.000 <br /> Treatment p\ant 0.6 mgd $2 $ \ .200.000 <br /> TOT AI. CONSTROCTIOH COST S3.594.000 <br /> * Does not Include engineering or coot ingencies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.