Laserfiche WebLink
<br /> TABLE 4A. W ASTEW A TER SYSTEM iMPROVEMENTS <br /> AND COST ESTIMATES* <br /> YEAR 1990 IMPROVEMENTS <br /> DESCRIPTION QUANTITY UNIT PRICE COST* <br /> 24-tnch interceptor pipe <br /> (west of tH 35) 7000 ft $96 $672.000 <br /> 1 a-inch interceptor pipe <br /> (east of tH 35) 5000 ft. $72 $360.000 <br /> 27-inch interceptor pipe 4500 ft. $\08 $486.000 <br /> 30-inch interceptor pipe 4500 ft. $\20 $540.000 <br /> Uft Station <br /> (at treatment p\aot> 1400 gpm $140 $196.000 <br /> un 5tat\on (west of LH 35) \ 000 gpm $140 $ \ 40.000 <br /> Treatment p\ant 0.6 mgd $2 $ \ .200.000 <br /> TOT AI. CONSTROCTIOH COST S3.594.000 <br /> * Does not Include engineering or coot ingencies. <br />