Laserfiche WebLink
<br /> where: <br /> L95$ = 1995 lPP cost share factor <br /> L05$ = 2005 LPP cost share factor <br /> U95$ = 1995 UPP cost share factor <br /> U05$ = 2005 UPP cost share factor <br /> A$ = Rívergate share of 3.0 MG tank cost <br /> C$ = Other ~are of 3.0 MG tank cost <br /> (4) 2.0 MG standpipe at High Ridge (1995) <br /> B$ = BNE05 - BNE90 C$ = CNE05 - CNE90 <br /> NEO5 - NE90 NE05 - NE90 <br /> where: <br /> BNE05 = 2005 NEPP High Ridge LUEls <br /> NE05 = 2005 NEPP Total LUE's <br /> .....etc. <br /> ( 5) 2.0 MG storage tank near Rivergate (2005) <br /> Distribute according to additional needs between 1995 <br /> and 2005 as determined above for 3.0 MG tank: <br /> L$ = Sl05 U$ = SU05 <br /> - - <br /> s,.05 ST05 <br /> A$ = Al05 - AL95 AU05 - AU95 <br /> L$ + U$ <br /> LOS - L95 U05 - U95 <br /> C$ = 1.05 - CL95 CU05 - CU95 <br /> L$ + U$ <br /> Lo5 -. L95 U05 - U95 <br /> A-4 <br />