Laserfiche WebLink
<br /> TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT <br /> ARTICLE 1 ments to previous Statements of Probable Construction <br /> ARCHITECT'S SERVICES AND RESPONSIBILITIES Cost indicated by changes in requirements or general <br /> market conditions. <br /> BASIC SERVICES 1.3.4 The Architect shall assist the Owner in connection <br /> The Architect's Basic Services consist of the five with the Owner's responsibility for filing documents re- <br /> phases described in Paragraphs 1.1 through 1.5 and quired lor the approval of governmental authorities hav- <br /> include normal structural, mechanical and electrical ing jurisdiction over the Project. <br /> engineering services and any other services included 1.4 BIDDING OR NEGOTIATION PHASE <br /> * in Article 15 as part of Basic Services. *1.4.1 The Architect, following the Owner's approval of <br /> 1.1 SCHEMATIC DESIGN PHASE the Construction Documents and of the latest St~tement <br /> 1.1.1 The Architect shall review the program furnished of Probable Construction Cost, shall <br /> by the Owner to ascertain the requirements of the Project obtain bids or negotiated proposals, and assist in <br /> and shall review lhe understanding of such requirements awarding and preparing contracts for construction. <br /> '!lith the Owner. 1.5 CONSTRUCTION PHASE-ADMINISTRATION <br /> 1.1.2 The Architect shall provide a preliminary evalua- OF THE CONSTRUCTION CONTRACT <br /> tion of the program and the Project budget requirements, 1.5.1 The Construction Phase will commence with the <br /> each in terms of the other, subject to the limitations set award of the Contract for Construction and, together with <br /> forth in Subparagraph 3.2.1. the Architect's obligation to provide Basic Services under <br /> 1.1.3 The Architect shall review with the Owner alterna- this Agreemént, will terminate when final payment to the <br /> tive approaches to design and construction of the Project. Contractor is due, or in the absence of a final Certificate <br /> 1.1.4 Based on the mutually agreed upon program and for Payment or of such due date, sixty days after the Date <br /> Project budget requirements, the Architect shall prepare, of Substantial Completion of the Work, whichever occurs <br /> for approval by the Owner, Schematic Design Documents first. <br /> consisting of drawings and other documents illustrating 1.5.2 Unless otherWise provided in this Agreement and <br /> the scale and relationship of Project components. incorporated in the Contract Documents, the Architect <br /> 1.1.5 The Architect shall submit 'to the Owner a State- shall provide administration of the Contract for Construc- <br /> ment of Probable Construction Cost based on current tion as set forth below*and in the edition of AlA Docu- <br /> area, volume or other unit costs. ment A201, General Conditions of the Contract for Con- <br /> struction, current as of the date of this Agreement. <br /> 1.2 DESIGN DEVElOPMENT PHASE 1.5.3 The Architect shall be a representative* of the <br /> 1.2.1 Based on the approved Schematic Design Docu- Owner during the Construction Phase, and shall advise <br /> ments and any adjustments authorized by the Owner in and consult with the Owner. Instructions to the Contrac- <br /> the program or Project budget, the Architect shall pre- tor shall be forwarded through the Architect.*The Archi- <br /> pare, for approval by the Owner, Design Development tect shall have authority to act on behalf of the Owner <br /> Documents consisting of drawings and other documents only to the extent provided in the Contract Documents <br /> to fix and describe the size and character of the entire unless otherwise modified by written instrument in ac- <br /> Project as to architectural, structural, mechanical and elec- cordance with Subparagraph 1.5.16. <br /> trical systems, materials and such other elements as may 1.5.4 The Architect shall. visit the site at intervals ap- <br /> be appropriate. propriate to the stage of construction or as otherwise <br /> 1.2.2 The Architect shall submit to the Owner a further agreed by the Architect in writing to become generally* <br /> Statement of Probable Construction Cost. familiar with the progress and quality of the Work and to <br /> 1.3 CONSTRUCTION DOCUMENTS PHASE determine*in general if the Work is proceeding in accord- <br /> ance with tIle Contract Documents; However, the Archi- <br /> 1.3.1 Based on the approved Design Development Doc- tect shall not be required to make exhaustive* <br /> uments and any further adjustments in the scope or qual- on-site inspections to check the quality or*quan- <br /> ity of the Project or in the Project budget authorized by tity of the Work. On the basis of such on-site observa- <br /> the ~wner, the Archit~ct sheill prepare a1.1. contrp.ct tions as an architect, the Architect shall keep the Owner <br /> ,and or constr.uctlon ocuments ~ 1:11c'tud1:ng: informed of the progress and quality of the Work, and <br /> d~8t~1t.~~~p~~[~!t~~~~~j~2f~~S~¡S~Þð~f~8~ shall endeavor*to guard the Owner against defects and <br /> deficiencies in the Work of the Contractor. * <br /> * ~~.2 I n~ ~rcn,tèct shall assist the Owner In the prepara- 1.5.5 The Architect shall not have control or charge of <br /> tion of the necessary bidding information, bidding forms, and shall not be responsible for construction means, <br /> the Conditions of the Contract/and the form of .Agree- methods, techniques, sequences or procedures, or for <br /> ment between the Owner and the Contractor. safety precautions and programs in connection with ,the <br /> 1.3.3 The Architect shall advise the Owner of any adjust- Work, for the acts or omissions of the Contractor, Sub- <br /> AlA DOCUMENT 8141 . OWNER-ARCHITECT AGREEMENT' THIRTEENTH EDITION' JULY 1977. AIA3 . (þ 1977 8141-1977 3 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1ns NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 <br /> * See Article 15, Other Conditions Or Servic~s <br />