Laserfiche WebLink
<br /> Z IIIL CITY OF SAN MARCOS <br /> <br /> OFFICE MEMORANDUM <br /> TO: A.C. Gonzalez, City Manager <br /> FROM: Daniel J. Brown, Public Works Administrator <br /> SUBJECT: REVISION OF OVERTIME LINE ITEMS <br /> DATE: December 20, 1983 RE: DEPARTMENT 68 & DEPARTMENT 75 <br /> There is an immediate need to revise the budgets in the above referenced departments to <br /> address overtime needs. <br /> In Department 68, Engineering and Environment, there is a need to create an overtime line <br /> item to address organizational needs that cannot be handled during normal working hours <br /> due to the workload and the lack of an adequate personnel staffing level. Specifically, <br /> water and wastewater maps are two years outdated, plat and plan files are disorganized, and <br /> reorganization of the department's operations have not yet been addressed (e.g., position <br /> descriptions, organization charts, responsibility delineation). To address these needs, <br /> creation of a $4,000 overtime line item is needed. Having reviewed the department's bud- <br /> get, I believe that $4,000 from line item 5110 (salaries) can be redesignated for overtime <br /> due to savings resulting from the vacancies in the three surveying positions. The sur- <br /> veying vacancies are newly created positions. Engineering did not hire immediately after <br /> the October 1, 1983 budget went into effect because they felt that the necessary surveying <br /> equipment should be bought prior to the positions being filled. The equipment has now <br /> been purchased and the positions are presently being advertised and/or filled. However, if <br /> this need for overtime is not addressed immediately, the department's operations will <br /> deteriorate. <br /> In Department 75, Vehicle Maintenance, the overtime line item has been 63% expended thru <br /> 20% of the fiscal year, leaving a balance of $463.16 for the remainder of the fiscal year. <br /> Overtime has been used extensively to meet the operational needs of other departments, who <br /> need their vehicles repaired quicker than is possible utilizing normal working hours only. <br /> Also, the City Shop has been reconditioning and painting vehicles with use of some overtime; <br /> by doing such, the City Shop can add approximately 50,000 miles of usability to the vehicle <br /> for approximately $1,000 cost as opposed to replacing the vehicle at a cost of $8,000. How- <br /> ever, to continue to meet the work demand, $1,500 can be redesignated from the 5110 line <br /> item (salaries). <br /> To recap the above, I am asking for the following revisions: <br /> A) Department 68: Line Item Amount <br /> 10-68-5110 ($4,000) <br /> *10-68-5112 4,000 <br /> *Note: this revision requires the formation of an overtime line item; <br /> B) Department 75: Line Item Amount <br /> 10-75-5110 ($1,500) <br /> 10-75-5112 1,500 <br /> (contd.) <br /> CSM-100 <br />